Laserfiche WebLink
14 <br /> 2112 <br /> Response to Plan Review Comments <br /> December 26, 2018 <br /> To: Thad Newport <br /> City of Everett <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Re: Plan Review Comments for Public Works Permit Application - PW1709-047 (B1709-039) <br /> Thad, <br /> The following information is in response to the Public Works memorandum dated December 5, 2018. <br /> 1. Please see civil engineering drawings and comment response letter for additional <br /> information. <br /> 2. Please see civil engineering drawings and comment response letter for additional <br /> information. <br /> 3. The comments below were generated from this project's Planning Reviewer. If you have any <br /> questions regarding these comments, please contact Grace Pollard with the City of Everett <br /> Planning Department (425-257-8807 or GPollard@everettwa.gov). <br /> a. Revise architectural site plan to match civil site plan. <br /> [2812 Response] Site plans and Landscape plan have been matched. <br /> b. Revise Landscape Plan to match civil site plan and; <br /> i. Landscape Plan requirements (EMC 19.35.100) include showing calculations of the lot area <br /> and the area of the lot required to be landscaped (separately list the area of parking lot <br /> landscaping and other required landscaping). <br /> [2812 Response] See drawing L-2 for required calculations. <br /> ii. All required perimeter landscaping must include trees, shrubs, and groundcover meeting Type <br /> III standards of EMC 19.35.050.C. Please ensure this standard is being met; <br /> [2812 Response] Perimeter landscaping includes trees, shrubs and groundcover meeting <br /> Type III standards. One hundred percent of the trees used are broadleaf deciduous. Shrubs <br /> and living ground cover have been chosen to attain a coverage of ninety percent in three years. <br /> 2812 Colby Avenue ,. Everett WA 98201 <br /> P(425)252-2153 r/,�2 www.2812architecture.com <br />