My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3610 GRAND AVE 2021-05-04
>
Address Records
>
GRAND AVE
>
3610
>
3610 GRAND AVE 2021-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 11:33:43 AM
Creation date
5/4/2021 11:33:27 AM
Metadata
Fields
Template:
Address Document
Street Name
GRAND AVE
Street Number
3610
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/7/2021 Page 1 'eV <br /> City of Everett <br /> 9:52:58AM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E2101-068 Site Address 3610 RUCKER AVE <br /> Applied 1/14/2021 Applicant POWERHOUSE ELECTRICAL INC Lot <br /> Approved 1/14/2021 Owner 3608 RUCKER AVE LLC Block <br /> Issued 1/14/2021 Contractor POWERHOUSE ELECTRICAL INC Tract <br /> Parent Permit No. B2005-031 Description Wire detached unit <br /> Notes Wire detached unit <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 1/19/2021 1/19/2021 ELEC 06-ROUGH TJJO APPROVAL (1/19/2021 3:08 PM TJJO) <br /> IN Contractor adding 20a laundry circuit <br /> Fixing 1 1/4"nail plates <br /> Check afci/gfci on final <br /> 1/19/2021 1/19/2021 ELEC 06-ROUGH SKB APPROVAL eTRAKiT Inspection 1/14/2021 3:39 PM POWERHOUSE <br /> IN Request ELECTRICAL INC <br /> cover only <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL INC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> (1/19/2021 4:21 PM SKB) <br /> Ride along. <br /> 1/19/2021 1/19/2021 ELEC 05-SERVICE SKB APPROVAL as noted (1/19/2021 4:21 PM SKB) <br /> Contractor burying the grounding electrode <br /> conductor 1 foot.Check all over current <br /> AFCI GFCI at final. <br /> 2/24/2021 2/24/2021 ELEC 09-FINAL TJJO CANCELLED Contractor Will 2/21/2021 5:56 PM POWERHOUSE <br /> cancelled ELECTRICAL INC <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL INC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> 3/3/2021 3/3/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 3/1/2021 6:39 PM POWERHOUSE <br /> Request ELECTRICAL INC <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL INC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> (3/3/2021 3:01 PM SKB) <br /> Bathroom is not energize to test must be on <br /> a dedicated 20 amp circuit for the <br /> receptacle.Contractor still needs to add 20 <br /> amp dedicated laundry circuit.Microwave <br /> cannot be on the small appliance circuits. <br /> Dishwasher not energized to test.Two pole <br /> 240 volt heat breaker does not have a <br /> handle ties and breakers not sitting right. <br /> Label all circuits.This is not a complete not <br /> ready. <br /> INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.