Laserfiche WebLink
( g 2 <br /> 4/7/2021 City of Everett <br /> 9:52:58AM <br /> INSPECTION ACTIVITY REPORT <br /> 3/9/2021 3/9/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 3/8/2021 6:16 PM POWERHOUSE <br /> Request ELECTRICAL INC <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL 1NC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> (3/9/2021 10:50 AM SKB) <br /> AFCl/GFCI protection must be done at the <br /> overcurrent device as this is a stack unit <br /> and the entire circuit must be protected by <br /> AFCI.Show a load calculation for the sub <br /> panel.Derate the conductors in the conduit <br /> feeding the sub panel and install oversized <br /> conductors as needed. <br /> 3/11/2021 3/11/2021 ELEC 09-FINAL SKB CORRECTION eTRAKiT Inspection 3/10/2021 5:14 PM POWERHOUSE <br /> Request ELECTRICAL INC <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL INC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> (3/11/2021 2:01 PM SKB) <br /> Eaton Breaker is not allowed in the Square <br /> D home line panel.Properly be ready to <br /> wire or install second conduit that goes to <br /> the sub panel.The subpanel needs to have a <br /> load calculation or an over current device <br /> sufficient to carry the entire load.No <br /> diversity is given as this is not carrying the <br /> entire dwelling.Properly install the 3/4"pvc <br /> on the side of the house. <br /> 3/12/2021 3/12/2021 ELEC 09-FINAL SKB APPRVD-PERN eTRAKiT Inspection 3/11/2021 6:26 PM POWERHOUSE <br /> Request ELECTRICAL INC <br /> Available alter 10:00 am <br /> Contact Name:POWERHOUSE <br /> ELECTRICAL INC <br /> Site Address:3610 RUCKER AVE <br /> Phone:2069150492 <br /> e-Mail:powerhousewiring@gmail.com <br /> INSP12 <br />