Laserfiche WebLink
Tony Lee <br />From: Tony Lee <br />Sent: Tuesday, March 19, 2019 10:12 AM <br />To: 'audiew@mckinstry.com' <br />Cc: 'holly.shoubridge@mortenson.com' <br />Subject: Providence 9th floor mechanical review B1903-002 <br />Hello Mr. Wallace — <br />I have just one comment regarding the plan review for Providence — <br />There are some ducts that penetrate one -hour fire barriers surrounding Clean Rooms A9055 and C9156 that are not <br />provided with fire dampers and have flexible connections to their (outlet or inlet) terminals at some point along the <br />trunk line (outside of the clean rooms in question). I believe the design intent is to employ Exception 3 to Section 717.5.2 <br />however that exception requires continuous No. 26 gage ductwork with no flexible ducts or terminal connections. Please <br />clarify. <br />I believe this email to be more expedient than a formal letter for just one comment. Let me know if I can answer any <br />further questions. Thank you, Tony <br />CELEBRATING Tony Lee <br />125 Building Official I Permit Services <br />Y E A" R 5 425.257.8812 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />A story worth telling everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />