Laserfiche WebLink
Tony Lee <br />From: Tony Lee <br />Sent: Wednesday, March 20, 2019 9:31 AM <br />To: 'Audie Wallace' <br />Subject: RE: Providence 9th floor mechanical review B1903-002 <br />Sounds good, thanks. <br />CELEBRATING Tony Lee <br />125 Building Official I Permit Services <br />Y E A R S 425.257.8812 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br />A story worth telling everettwa.gov/permits I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />From: Audie Wallace <audiew@McKinstry.com> <br />Sent: Wednesday, March 20, 2019 9:03 AM <br />To: Tony Lee <TLee@everettwa.gov> <br />Subject: RE: Providence 9th floor mechanical review B1903-002 <br />Tony <br />We won't be able to submit plans with changes, as we are the mechanical contractor and are providing shop <br />drawings for installation. <br />I'll talk with the engineer of record at Stantec and let him know you need a second copy and will want the <br />changes indicated, he'll need to submit that permit set. <br />Thanks <br />Audie Wallace <br />Project Director <br />p 206.832.8019 1 c 206.930.0436 <br />McKinstry <br />Consulting I Construction I Energy I Facility Services <br />www.mckinstry.com <br />From: Tony Lee <TLee@everettwa.gov> <br />Sent: Wednesday, March 20, 2019 8:25 AM <br />To: Audie Wallace <audiew@McKinstry.com> <br />Subject: RE: Providence 9th floor mechanical review B1903-002 <br />Ok — I only have one copy of the mechanical drawings for review. We will need two copies before I can issue the permit <br />(after the building permit is issued). We would like the changes to be made to the mechanical drawings prior to <br />resubmission. <br />1 <br />