My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 13TH ST 9TH FLOOR 2022-01-20
>
Address Records
>
13TH ST
>
1700
>
9TH FLOOR
>
1700 13TH ST 9TH FLOOR 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 3:05:06 PM
Creation date
5/4/2021 2:09:34 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1700
Tenant Name
9TH FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/4/2020 <br />City of Everett <br />page 2 <br />,3i:45:37PM <br />INSPECTION ACTIVITY REPORT <br />7/24/2019 <br />7/24/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />patient rooms north <br />Low Pressure Ducts <br />side <br />206-255-7870 <br />(7/24/2019 2:05 PM SDP) <br />Ok final for the patient rooms along north <br />wall. <br />8/19/2019 <br />8/19/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />Level 9 sector <br />IN <br />206-396-5197 <br />(8/19/2019 3:00 PM SDP) <br />Zone "F" <br />1) Low pressure supply into each room <br />2) Exhaust trunk line. <br />8/22/2019 <br />8/22/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />eTRAKiT Inspection <br />8/21/2019 1:19 PM Dan Lawler <br />IN <br />Request <br />Level 9 (South) Area C & F, Heating <br />System Pressure Test. <br />We will start filling system at 6:00am. <br />We plan to be under pressure by 8:00am. <br />Hold Pressure for 4 Hours. <br />Contact Name: Dan Lawler <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2066044919 <br />e-Mail: DANL@MCKINSTRY.COM <br />(8/22/2019 1:48 PM SDP) <br />Hydronic piping, supply and return, tested <br />at 150# for Zones C& F. ok to insulate. <br />9/5/2019 <br />9/5/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />Zones A, B & D <br />(9/5/2019 2:20 PM SDP) <br />Final ok in Zones D, A & B. <br />9/5/2019 <br />9/5/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />CSFD framing <br />Medium pressure/low pressure ducts, <br />IN <br />fire damper framing. <br />206-255-7870 <br />(9/5/2019 2:19 PM SDP) <br />1) SFD/FD framing and install ok in zone <br />F&C <br />2) Medium pressure duct ok to insulate in <br />zone C <br />3) Low pressure duct ok to insulate in zone <br />F&C <br />10/7/2019 <br />10/7/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />9th floor patient room restrooms <br />IN <br />206-255-7870 <br />(10/7/2019 2:45 PM SDP) <br />Zones C & F - bathroom supply heat and <br />exhaust. ok to cover. <br />10/30/2019 <br />10/30/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />Zones A, B, and D <br />12/5/2019 <br />12/5/2019 <br />MECH 04-ROUGH <br />DXW <br />APPROVAL <br />Fernando: 206-255-7870 <br />IN <br />(12/5/2019 2:41 PM DXW) <br />r.i. ok for south wing on 9 th. floor. <br />as noted complete duct to diffusers at <br />nurses station and solid waste station. <br />2/3/2020 <br />2/3/2020 <br />ADMIN USE <br />HPC <br />APPROVAL <br />ONLY" <br />2/3/2020 <br />2/3/2020 <br />MECH 06-FINAL <br />SDP <br />APPRVD-PERIL <br />Fernando: 206-255-7870 <br />'I2 <br />INSP12 CRWSYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.