Laserfiche WebLink
2/4/2020 <br />City of Everett <br />page 2 <br />,3i:45:37PM <br />INSPECTION ACTIVITY REPORT <br />7/24/2019 <br />7/24/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />patient rooms north <br />Low Pressure Ducts <br />side <br />206-255-7870 <br />(7/24/2019 2:05 PM SDP) <br />Ok final for the patient rooms along north <br />wall. <br />8/19/2019 <br />8/19/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />Level 9 sector <br />IN <br />206-396-5197 <br />(8/19/2019 3:00 PM SDP) <br />Zone "F" <br />1) Low pressure supply into each room <br />2) Exhaust trunk line. <br />8/22/2019 <br />8/22/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />eTRAKiT Inspection <br />8/21/2019 1:19 PM Dan Lawler <br />IN <br />Request <br />Level 9 (South) Area C & F, Heating <br />System Pressure Test. <br />We will start filling system at 6:00am. <br />We plan to be under pressure by 8:00am. <br />Hold Pressure for 4 Hours. <br />Contact Name: Dan Lawler <br />Site Address: 1700 13TH ST 9TH FLOOR <br />Phone:2066044919 <br />e-Mail: DANL@MCKINSTRY.COM <br />(8/22/2019 1:48 PM SDP) <br />Hydronic piping, supply and return, tested <br />at 150# for Zones C& F. ok to insulate. <br />9/5/2019 <br />9/5/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />Zones A, B & D <br />(9/5/2019 2:20 PM SDP) <br />Final ok in Zones D, A & B. <br />9/5/2019 <br />9/5/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />CSFD framing <br />Medium pressure/low pressure ducts, <br />IN <br />fire damper framing. <br />206-255-7870 <br />(9/5/2019 2:19 PM SDP) <br />1) SFD/FD framing and install ok in zone <br />F&C <br />2) Medium pressure duct ok to insulate in <br />zone C <br />3) Low pressure duct ok to insulate in zone <br />F&C <br />10/7/2019 <br />10/7/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />9th floor patient room restrooms <br />IN <br />206-255-7870 <br />(10/7/2019 2:45 PM SDP) <br />Zones C & F - bathroom supply heat and <br />exhaust. ok to cover. <br />10/30/2019 <br />10/30/2019 <br />MECH 06-FINAL <br />SDP <br />PARTIAL APPR <br />Zones A, B, and D <br />12/5/2019 <br />12/5/2019 <br />MECH 04-ROUGH <br />DXW <br />APPROVAL <br />Fernando: 206-255-7870 <br />IN <br />(12/5/2019 2:41 PM DXW) <br />r.i. ok for south wing on 9 th. floor. <br />as noted complete duct to diffusers at <br />nurses station and solid waste station. <br />2/3/2020 <br />2/3/2020 <br />ADMIN USE <br />HPC <br />APPROVAL <br />ONLY" <br />2/3/2020 <br />2/3/2020 <br />MECH 06-FINAL <br />SDP <br />APPRVD-PERIL <br />Fernando: 206-255-7870 <br />'I2 <br />INSP12 CRWSYSTEMS <br />