My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1700 13TH ST 9TH FLOOR 2022-01-20
>
Address Records
>
13TH ST
>
1700
>
9TH FLOOR
>
1700 13TH ST 9TH FLOOR 2022-01-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 3:05:06 PM
Creation date
5/4/2021 2:09:34 PM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1700
Tenant Name
9TH FLOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/4/2020 City of Everett Page 1 <br />,.i2:45:37PM <br />INSPECTION ACTIVITY REPORT <br />Permit No. M1903-054 <br />Applied <br />3/15/2019 <br />Approved <br />4/29/2019 <br />Issued <br />5/2/2019 <br />Parent Permit No. <br />B1903-002 <br />Site Address 1700 13TH ST 9TH FLOOR <br />Applicant Lot <br />Owner PROVIDENCE HEALTH Block <br />Contractor MCKINSTRY CO LLC Tract <br />Description NEW SUPPLY/EXHAUST AIR DUCTWORK DISTRIBUTION, D <br />Notes CONNECTING TO EXISTING BUILDING CENTRAL HVAC EQUIPMENT <br />Scheduled <br />Combleted <br />Tvpe <br />Inspector <br />Result <br />Remarks <br />Inspector's Comments <br />4/19/2019 <br />4/19/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />CSFD framing <br />(4/19/2019 2:24 PM SDP) <br />IN <br />FSD's framing for Zone A - ok to cover <br />4/24/2019 <br />4/24/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />CSFD framing <br />(4/24/2019 2:37 PM SDP) <br />IN <br />Zone D- FSD framing ok. <br />Zone D - medium pressure duct from grid <br />lines H-E and 3 - 4.Out of shaft through <br />existing FSD. <br />4/30/2019 <br />4/30/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />CSFD framing/ <br />Phone: 425-257-8121 <br />IN <br />install <br />(4/30/2019 2:05 PM SDP) <br />SFD from area A to area B ( C - E and 3 -5) <br />Area D ducting - ok to insulate <br />Area D med pressure/ North side - ok to <br />insulate. <br />5/3/2019 <br />5/3/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />Dan <br />- <br />IN <br />206-604-4919 <br />8-12:30pm on test, please arrive during that <br />time. <br />(5/3/2019 3:17 PM SDP) <br />Hydronic piping, supply and return, tested <br />at 150#'s. Ok for insulation. <br />5/8/2019 <br />5/8/2019 <br />MECH 04-ROUGH <br />SDP' <br />PARTIAL APPR <br />CSFD framing / <br />206-255-7870 <br />IN <br />install <br />(5/8/2019 1:30 PM SDP) <br />Zone "D" - south corridor, med pressure, ok <br />to insulate <br />Zone "B" F.S.D. framing - ok <br />5/15/2019 <br />5/15/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />Phone: 206-396-5197 Dave <br />IN <br />(5/15/2019 2:30 PM SDP) <br />Zone " A" trunk lines - complete. <br />5/29/2019 <br />5/29/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />(5/28/2019 2:47 PM CRB) <br />IN <br />OK TO INSULATE MEDIUM AND LOW <br />PRESSURE IN ZONE B... 206-255-7870 <br />(5/29/2019 3:23 PM SDP) <br />Ok to insulate med/low pressure ducts in <br />Zone B. <br />6/5/2019 <br />6/5/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />Phone: 206-255-7870 <br />IN <br />(6/5/2019 12:05 PM SDP) <br />Ok to cover hard lids in patient bathrooms. <br />6/26/2019 <br />6/26/2019 <br />MECH 04-ROUGH <br />SDP <br />PARTIAL APPR <br />9th floor zone b <br />IN <br />206-255-7870 <br />(6/26/2019 2:51 PM SDP) <br />Zone B hard lids ok to cover. <br />Zone A Isolation rooms, exhaust in walls ok <br />to cover. <br />7/8/2019 7/8/2019 MECH 05-OTHER SDP OTHER CSFD install see <br />attachments <br />11-2- <br />=wSymms <br />INSP12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.