My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1913 HOYT AVE WHOLE SITE 2022-05-23
>
Address Records
>
HOYT AVE
>
1913
>
WHOLE SITE
>
1913 HOYT AVE WHOLE SITE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:57:47 AM
Creation date
5/4/2021 2:11:26 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
1913
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION I: PROJECT DESCRIPTION <br /> The proposed project Hoyt 4 Unit is located at 1913 Hoyt Ave, Everett, WA- <br /> 98201-2237. More generally, the site is located in Section 19, Township 29 North, and <br /> Range 5 East of the Willamette Meridian in the City of Everett, Washington. Please refer to <br /> the Vicinity Map attached later in the section. <br /> The site is currently vacant. The site exists as residential landscaping. The site is <br /> relatively flat that appears the slight slope towards Hoyt Ave as well towards the alley. Per <br /> ' NRCS survey of Snohomish County,the project site contains Alderwood Urban Land <br /> Complex 2 to 8 percent soils that have a hydrologic classification of Type "C". Please refer <br /> to the soils map and descriptions attached later in this report for more details. <br /> The site area is 0.14 Acres. The proposal is to construct two duplexes and utilities <br /> associated to it. The access to the site will be from the Alley. <br /> Minimum requirements 1-5 apply to the project because the project Lot's effective <br /> impervious area is 3,837 SF which is less than 5,000 SF. Onsite storiiiwater management <br /> ' (MR#5) for the proposed building will also be provided by splash blocks to disperse the <br /> runoff and direct it towards the streets. <br /> I <br /> f <br /> I <br /> 1 <br /> I <br /> I <br /> Insight Engineering Co. -Stormwater Site Plan 10/19/17 <br /> -3 - <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.