Laserfiche WebLink
1 <br /> ' 2014 SWMMWW MINIMUM REQUIREMENTS SUMMARY <br /> MR : MINIMUM REQUIREMENT <br /> SSP : STORMWATER SITE PLAN <br /> ' MR#1 PREPARATION OF STORMWATER SITE PLAN: <br /> Stormwater site plan follows the 2014 Stormwater Management Manual for Western <br /> Washington. <br /> MR#2 CONSTRUCTION OF STORMWATER POLLUTION PREVENTION <br /> PLAN (SWPPP): <br /> Refer to section IV for SWPPP. <br /> MR#3 SOURCE CONTROL OF POLLUTION: <br /> Onsite BMP's will be used to minimize the source pollutant sources that include <br /> parts/vehicle cleaning, spills/leaks of fuel and other liquids, replacement of liquids, outdoor <br /> storage of batteries/liquids/parts, and vehicle parking. <br /> MR#4 PRESERVATION OF NATURAL DRAINAGE SYSTEMS AND <br /> OUTFALLS: <br /> The developed site drainage will be discharged towards an existing drainage system along <br /> the Hoyt Ave to continue its natural drainage path. <br /> MR#5 ONSITE STORMWATER MANAGEMENT: Splash blocks per BMP T5.10B <br /> will be provided to satisfy the stomwater management requirement for the site. BMP T5.13 <br /> Post-Construction Soil Quality and Depth will provide additional stormwater management <br /> for the site. <br /> I <br /> I <br /> 1 <br /> 1 <br /> Insight Engineering Co. Stormwater Site Plan 10/19/17 <br /> -4- <br /> I <br />