My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002 MADISON ST EVERSPACE 2022-02-22
>
Address Records
>
MADISON ST
>
2002
>
EVERSPACE
>
2002 MADISON ST EVERSPACE 2022-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2022 9:54:00 AM
Creation date
5/4/2021 3:28:58 PM
Metadata
Fields
Template:
Address Document
Street Name
MADISON ST
Street Number
2002
Tenant Name
EVERSPACE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BURT18530 MERIDIAN AVE N. <br />ENGINEERING SHORELINE, WA 98133 <br />iomE. <br />7. Sheet 51.1 shows a new footing at Grid B/1.1 and references Detail D/S2.1. See IBC <br />Sections 107.2.1 and 1603.1. The following comments should be addressed: <br />a. The plan indicates the existing footing includes a plinth and that a new wood <br />post shall be installed below the existing beam with a cast -in connection. The <br />detail does not show this level of detail and should be revised. The Simpson <br />product required should be specified. <br />b. The detail does not specify a required thickness and instead appears intended to <br />match the existing footing. The thickness of the existing footing does not appear <br />to be known. A minimum thickness for the new footing should be specified. <br />c. The required width of the foundation measured perpendicular to the face of the <br />existing foundation should be specified. <br />Response: Items a, b and c is now shown on Detail DIS2.1 <br />8. The footing at Grid B/2 on Sheet S1.1 appears to support a design load of at least 10 <br />kips. This exceeds the allowable bearing capacity at the footing. Calculations <br />substantiated the design of the footing including soil bearing shall be submitted for <br />review. See IBC Sections 1604.1 and 1605.3. <br />Response: See revised footing calculations. Footing size revised on plan sheet S1.I to <br />match calculations (3'-0"x3'-0"x10') <br />Gravity System: <br />9. Sheet A2.1 indicates existing beams on Grids 13/1-2, C/1-2, and 2/13-C will be replaced by <br />new beams. The Floor framing Plan on Sheet 51.1 does not indicate replacement of <br />beams at these locations. The structural design should be coordinated with the <br />architectural drawings and revised as needed. Calculations substantiating modifications <br />to the gravity system shall be submitted for review. See IBC Sections 1603.1 and <br />1604.1. <br />Response: Beams to be replaced are at the roof level. Beam at grid 2/B-C shall remains <br />and will not be replaced. <br />
The URL can be used to link to this page
Your browser does not support the video tag.