My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
" Earth Solutions NWLLC <br />ESNW Rep. <br />Project No. <br />Page <br />Report No. <br />EMH <br />4938.10 <br />1 of 1 <br />103 <br />15365 NE 901h Street, Suite 100 <br />Time On Site <br />Time Off Site <br />Date <br />Day of Week <br />t Redmond, WA 98052 <br />Main (425) 449-4704 1 Fax (425) 449-4711 <br />9:15 AM <br />9:30 AM <br />1 /6/20 <br />Mon <br />www,esnw.com <br />Travel Time <br />Weather <br />DAILY FIELD REPORT <br />15 Min <br />300s F, Rain <br />Project Name <br />Job Location <br />Client/Owner <br />Riverview Apartments <br />1616 East Marine View Drive, Everett <br />Heartland Construction <br />LLC <br />General Contractor <br />Contact <br />Field Supervisor <br />Reviewed <br />t�ty <br />Heartland Construction <br />Barry <br />LAC <br />* <br />Grading Contractor <br />Contact <br />Project Manager <br />Reviewed <br />Aero Construction <br />Scott Adams <br />RAC <br />Are approved plans/permits on site? Yes Project No. Permit No. <br />At the client's request, ESNW Rep was on site to observe remedial excavation stability and backfill preparation activity. <br />Remedial Excavation Stability & Backfill Preparation <br />While on site Rep observed the contractor began hanging miradrain covering the lower third of the shoring wall per the <br />approved post -excavation design. Rep observed the remedial excavation was stable in its current configuration and condition. <br />It is recommended that Rep be notified immediately if any changes in the slope conditions are observed. It is the responsibility <br />of the contractor to perform all necessary safety measures in accordance with state and federal regulations. ESNW rep will <br />return daily to observe the condition of the temporarily over -steepened shoring excavation. <br />ESNW Rep will return when requested. <br />Emmett Hartley, G.I.T. <br />ESNW Field Tech <br />t206) 376-4906 <br />`.lid <br />i" <br />M <br />F, <br />+cr <br />
The URL can be used to link to this page
Your browser does not support the video tag.