Laserfiche WebLink
Earth Solutions NW.-,, <br />1 15365 NE 90ih Street, Suite 100 <br />Redmond, WA 98052 <br />Main (425) 449-4704 i Fax (425) 449-4711 <br />www.esnw,com <br />ESNW Rep. <br />EMH <br />Project No. <br />4938.10 <br />Page <br />2 of 2 <br />Report No, <br />103c <br />Time On Site <br />Time Off Site <br />Date <br />Day of Week <br />9:15 AM <br />9:30 AM <br />116/20 <br />Mon <br />NPDES Permit No. <br />Reviewed <br />WAR307390 <br />CONSTRUCTION STORMWATER <br />GENERAL PERMIT - FIELD REPORT <br />Project Name Job Location Client/Owner <br />Riverview Apartments 1616 E Marine View Drive, Everett Heartland Construction LLC <br />Monitoring, Records & Recommendations <br />Will existing BMPs need to be modified or removed, or will other BMPs need to be installed? ❑ Yes 0 No <br />List the completed, not -yet -completed, or ongoing action items in the table below: <br />Actions Items <br />Completed? <br />`Lies; No; Ongoing) <br />bate <br />(If Completed) <br />Cover all soil stockpiles if unworked for 2+ days <br />Ongoing <br />Regularly sweep up track out on the road <br />Ongoing <br />Monitor contaminated soil excavation so that contamination stays contained <br />Ongoing <br />Concrete wash basins may overflow with high pH water when it rains, need to be covered <br />Ongoing <br />Monitor straw wattles surrounding catch basins to ensure they do not become overtopped with <br />eroded sediment <br />Ongoing <br />Current Weather. 30°s Rain <br />Precipitation since last inspection (approximate): 1.03 inches <br />Precipitation in the last 24 hours (approximate): 0.07 inches <br />Was water quality sampling part of this inspection? ❑ Yes 21 No <br />If "Yes": <br />• Record results in the table below. <br />• Characterize the stormwater discharge, e,g., the presence of suspended sediment, 'cloudiness", discoloration, or oil sheen, if <br />present: <br />• Hanna Turbidity Meter # <br />Monitoring Location Turbidity pH Notes <br />(NTIJ) <br />Is the site in compliance with the SWPPP and the permit requirements? Q Yes <br />If "No": <br />• Indicate the tasks necessary to bring the site into compliance in the table above. <br />Has the non-compliance been reported to the Department of Ecology? ❑ Yea <br />• Should the SWPPP be modified? ❑ Yes ❑ No <br />"This report is true, accurate, and complete to the best of my knowledge and belief." <br />❑ No <br />❑ No <br />Date:1/6/20 <br />