Laserfiche WebLink
Earth Solutions NWLILC <br />ESNW Rep. <br />Project No. <br />Page <br />Report No. <br />EMH <br />4938.10 <br />1 of 1 <br />104 <br />15365 NE 90'" Street, Suite 100 <br />Time On Site <br />Time Off Site <br />Date <br />Day of Week <br />Redmond, WA 98052 <br />Main (425) 449-4704 i Fax (425) 449-4711 <br />10:00 AM <br />10:15 AM <br />1/7/20 <br />Tue <br />www.esnw.com <br />Travel Time <br />Weather <br />DAILY FIELD REPORT <br />30 Min <br />401)s F, Cloud <br />Project Name <br />Job Location <br />Client/Owner <br />Riverview Apartments <br />1616 East Marine View Drive, Everett <br />Heartland Construction LLC <br />General Contractor <br />Contact <br />Field Supervisor <br />Reviewed <br />Heartland Construction <br />Barry <br />LAC <br />*11/14 <br />Grading Contractor Contact Project Manager Reviewed <br />Aero Construction I Scott Adams I RAC <br />Are approved plans/permits on site? Yes A Project No. Permit No. <br />At the client's request, ESNW Rep was on site to observe remedial excavation stability and backfill preparation activity. <br />Remedial Excavation Stability & Backfill Preparation <br />While on site Rep observed the contractor continued hanging miradrain covering the lower third of the shoring wall per the <br />approved post -excavation design. Rep observed the contractor began hanging Stego wrap over the miradrain per the <br />approved post -excavation design. Rep observed the remedial excavation was stable in its current configuration and <br />condition. It is recommended that Rep be notified immediately if any changes in the slope conditions are observed. It is the <br />responsibility of the contractor to perform all necessary safety measures in accordance with state and federal regulations. <br />ESNW rep will return daily to observe the condition of the temporarily over -steepened shoring excavation. <br />ESNW Rep will return when requested. <br />Emmett Hartley, G.I.T. <br />ESNW Field Tech <br />(206) 376-4906 <br />M Y <br />Ktir <br />