Laserfiche WebLink
Riverview Apartments Stormwater Pollution Prevention Plan <br />2.1.6 Element 6: Protect Slopes . <br />All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes <br />erosion. <br />Minimal construction is proposed for wet weather season and slope protection can be <br />established with final landscaping. <br />The following specific BMPs will be used to protect slopes for this project: <br />Will steep slopes be present at the site during construction? <br />❑ Yes® No <br />List and describe BMPs: BMP C12O: Temporary and Permanent Seeding <br />Installation Schedules: <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />• <br />CPH Project No. 0024-17-037 August 28, 2018 <br />CP I H CONSULTANTS Page 11 <br />