My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverview Apartments <br />Stormwater Pollution Prevention Plan <br />• <br />• <br />is <br />2.1.5 Element 5: Stabilize Soils <br />Exposed and unworked soils shall be stabilized with the application of effective BMPs to prevent <br />erosion throughout the life of the project. <br />In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be <br />temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion, <br />protected with sediment trapping measures, and where possible, be located away from storm <br />drain inlets, waterways, and drainage channels. <br />Exposed and unworked soils will be stabilized according to the time period set forth for dry and <br />wet seasons as outlined below: <br />West of the Cascade Mountains Crest <br />Season <br />Dates <br />Number of Days Soils Can <br />be Left Exposed <br />During the Dry Season <br />May 1 — September 30 <br />7 days <br />During the Wet Season <br />October 1 — April 30 <br />2 days <br />Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br />the weather forecast. <br />Anticipated project dates: Start date: Winter 2019 End date: Spring 2021 <br />Will you construct during the wet season? <br />® Yes ❑ No <br />List and describe BMPs: BMP C121: Mulching <br />BMP C123: Plastic Covering <br />BMP C125: Topsoiling/Composting <br />BMP C126: Polyacrylamide (PAM) for Soil Erosion Protection <br />BMP C250: Construction Stormwater Chemical Treatment <br />Installation Schedules: <br />Inspection and Maintenance plan: <br />Responsible Staff: <br />CPH Project No. 0024-17-037 <br />CP I H CONSULTANTS <br />August 28, 2018 <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.