My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
>
Address Records
>
E MARINE VIEW DR
>
1622
>
WHOLE SITE
>
1622 E MARINE VIEW DR WHOLE SITE 2022-02-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2022 2:59:04 PM
Creation date
5/5/2021 11:01:10 AM
Metadata
Fields
Template:
Address Document
Street Name
E MARINE VIEW DR
Street Number
1622
Tenant Name
WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
932
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Erosivity Waiver <br />Construction site operators may qualify for an erosivity waiver from the CSWGP if the <br />following conditions are met: <br />1. The site will result in the disturbance of fewer than 5 acres and the site is not a <br />portion of a common plan of development or sale that will disturb 5 acres or <br />greater. <br />2. Calculation of Erosivity "R" Factor and Regional Timeframe: <br />a. The project's rainfall erosivity factor ("R" Factor) must be less than 5 during the <br />period of construction activity, as calculated (see the CSWGP homepage <br />httD://www.ecv.wa.aov/Droarams/wo/storm.water/construction/i.ndex..html for a <br />link to the EPA's calculator and step by step instructions on computing the "R" <br />Factor in the EPA Erosivity Waiver Fact Sheet). The period of construction <br />activity starts when the land is first disturbed and ends with final stabilization. <br />In addition: <br />b. The entire period of construction activity must fall within the following <br />timeframes: <br />i. For sites west of the Cascades Crest: June 15 — September 15. <br />ii. For sites east of the Cascades Crest, excluding the Central Basin: <br />• June 15 — October 15. <br />iii. For sites east of the Cascades Crest, within the Central Basin: no additional <br />timeframe restrictions apply.'The Central Basin is defined as the portions <br />of Eastern Washington with mean annual precipitation of less than 12 <br />inches. For a map of the Central Basin (Average Annual Precipitation <br />Region 2), refer to http://www.ecy.wa.goyJ 2rogams/wq/stormwater/ <br />construction/resourcesgui.dan.ce.html . <br />3. Construction site operators must submit a complete Erosivity Waiver certification <br />form at least one week before disturbing the land. Certification must include <br />statements that the operator will: <br />a. Comply with applicable local stormwater requirements; and <br />b. Implement appropriate erosion and sediment control BMPs to prevent violations <br />of water quality standards. <br />4. This waiver is not available for facilities declared significant contributors of <br />pollutants as defined in Special Condition S 1.13. Lb. or for any size construction <br />activity that could reasonably expect to cause a violation of any water quality <br />standard as defined in Special Condition S 1.B.l.b.ii. <br />5. This waiver does not apply to construction activities which include non- <br />• stormwater discharges listed in Special Condition S1.C.3. <br />Construction Stornnvater General Permit <br />Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.