Laserfiche WebLink
Cc: Grant Moen <GMoen@everettwa.gov>; Souheil Nasr <SN asr@ eve rettwa.gov> <br />Subject: Question re pile driving near RCP <br />Hello Dan, <br />I know you are not in the office this week and might not be available to assist right now, so you can refer me to someone <br />else regarding this question. <br />A developer is proposing to install a pile and lagging shoring wall (105 LF) parallel to and close to an existing 48 inch <br />diameter RCP trunk sewer (circa 1948). We are concerned about the risk of damage to the sewer and are looking for <br />some advice from an expert. Attached is some reference information and I would be happy to speak with you or <br />someone else from Jacobs to elaborate on the situation. <br />If this issue amounts to some professional time on your part and perhaps a memo or letter deliverable, we could roll <br />that into the SEI to SRI intertie design amendment, otherwise hoping we might be able to just verbally discuss it in a <br />brief informal manner. <br />Thanks very much for your assistance. <br />Dave <br /><< File: Pipe record plan etc.pdf >> << File: Pile Lagging Wall plan.pdf >> <br />x <br />David Voigt, P.E. <br />Senior Engineer I Public Works <br />425.257.8983 13200 Cedar Street, Everett, WA 98201 <br />everettwa.gov/publicworks I Facebook I Twitter <br />Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant to the Public <br />Records Act. <br />