Laserfiche WebLink
• S <br /> Page 2 <br /> May 28,2019 <br /> 3. See sheet CS05 where energy credit 2A compliance notes have been provided. See <br /> consultant's XBE sheets for additional information. <br /> 4. See sheet CS05 where energy credit 5A compliance notes have been provided. Plumbing <br /> fixtures to be under separate plumbing permit. <br /> 5. See sheet CS05 where energy credit 5C compliance notes have been provided. Hot water <br /> equipment to be under separate permit. <br /> Structural <br /> 1. Structural review was approved without comments from Mr. Bronder. <br /> Some other revisions have been made to the drawings as a part of an internal QA review process. <br /> All revisions have been clouded and tagged. <br /> Sincerely, <br /> Seth . Project Architect <br /> JOHNSON BRAUND,INC. <br /> P:I Housing11705_DEVCO_ShajJer19 Project ManagementlBuilding Permit)lst ResponseslBuildingGlRiverview Building <br /> G_Architectural Responses_0I_190520.docx <br />