Laserfiche WebLink
■ Water Pollution Control Facility Plan <br /> ■ Existing Rate Study <br /> ■ Port Gardner Storage Facility Plan and H/H model <br /> ■ Information on Cityworks inputs, outputs, and formats conveyed in meeting between <br /> Murraysmith staff and City staff. <br /> ■ Other information as requested <br /> 3.2 Review Data Provided by City <br /> Review and catalogue the data provided by the City. <br /> Receivables <br /> • Pertinent records, drawings, and information relevant to the wastewater collection and <br /> conveyance systems. <br /> • Information compiled and requested in the Data Collection Log. <br /> Deliverables <br /> ■ Data Collection Request Log <br /> Assumptions <br /> ■ City staff to provide data requested in most appropriate and useful format within 10 <br /> working days of the data request. <br /> ■ Budget has been developed assuming all data is provided in electronic format. <br /> Task 4 — Flow Monitoring <br /> Objective <br /> Determine flow monitoring needs and coordinate with ADS to perform flow monitoring. <br /> Determine current and future wastewater flow projections. <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 7 <br />