Laserfiche WebLink
Work Tasks <br /> 4.1 Flow Monitoring Data <br /> Review existing flow monitoring data and identify potential new flow monitoring locations, if <br /> necessary. Existing data to be utilized as appropriate. Develop and submit a Flow Monitoring Plan <br /> for City review and approval. <br /> ADS to perform flow monitoring in accordance with the Flow Monitoring Plan. Assume up to 29 <br /> locations to be installed. ADS to provide finalized data to Murraysmith for use in I/I analysis and <br /> flow monitoring at the end of the agreed upon monitoring period. It is anticipated that flow <br /> monitoring to take place in both the combined and separated systems. <br /> 4.2 Current and Future Wastewater Flow Projections <br /> Review population and flow projections including those documented in the City's 2020 <br /> Comprehensive Water Plan, WPCF Plan, and PGSF Plan. City to identify and provide areas of <br /> growth in the study area. <br /> Document existing and future population and employment numbers in the service area and for <br /> the planning horizons. Utilize available flow monitoring data, water meter consumption data, and <br /> other sources to characterize wastewater flows for the existing system including: <br /> ■ Average Dry Weather Flow (ADWF) rate in gallons per capita per day (gpcd) using flow <br /> monitoring data <br /> ■ 24-hour weekday and weekend patterns for each flow monitoring site <br /> ■ Separation of domestic wastewater and infiltration/inflow (I/I) using water meter data <br /> ■ Large/Industrial users <br /> ■ I/I coefficients and unit rates to characterize metersheds <br /> ■ Wet weather flows (also to be generated through H/H modeling) <br /> Develop future wastewater flow projections for the same metrics using future population and <br /> growth projections. It is anticipated that the future ADWF to be based on existing per unit rate <br /> developed for the current conditions in conjunction with future population estimates. <br /> Receivables <br /> ■ Comments on Flow Monitoring Plan <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 8 <br />