Laserfiche WebLink
• Agenda and minutes for the Basis of Planning Workshop <br /> Assumptions <br /> • Flow monitors data collection period will capture rainfall events to sufficiently complete I/I <br /> analysis. <br /> • City of Everett data corresponding to flow monitoring period. <br /> • Population projections for the planning horizons will be obtained from the 2020 <br /> Comprehensive Water Plan. . <br /> • Water meter consumption data is available for all sewer customers. <br /> • Any sewer basin revisions will be reviewed and approved by the City prior to finalization. <br /> • Up to four (4) staff from Murraysmith will attend the Basis of Planning workshop, which <br /> will be two (2) hours in duration and be virtual. <br /> Task 6 — Existing Collection and Conveyance Sewer System Summary <br /> Objective <br /> Provide an overview of the existing system using the sewer system information received in Task 3. <br /> Work Tasks <br /> 6.1 System Overview <br /> Review and summarize existing system components, operation, and facility upgrades. Summarize <br /> the City's existing Utility Management Structure. Document, review, and summarize <br /> intergovernmental agreements related to the sewer conveyance system. <br /> 6.2 Existing Collection and Conveyance Facilities <br /> Review and document the City's existing collection and conveyance system including an inventory <br /> of existing conveyance piping, hydraulic structures including outfalls, and pump stations. <br /> 6.3 Draft Chapter 2— Existing Collection & Conveyance Sewer System <br /> Develop Draft Chapter 2 by compiling the results of Task 5. Submit draft to City for review and <br /> revise per comments. <br /> Receivables <br /> • Information related to criticality of existing sewer facilities. <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 11 <br />