My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 Service Area and Vicinity <br /> Review the current jurisdictional boundaries and land use designations to establish the study area <br /> for the planning horizons. Review and characterize the adjacent jurisdiction's service area in <br /> relation to the City's service area. <br /> Develop base map of the service area. <br /> 5.3 Sewer Drainage Basins <br /> Review delineations of the existing sewer basins and make refinements if necessary, to define <br /> extents for the Plan. Document pertinent information including area, summary of sewer system <br /> components contained in each sewer basin, and land uses. Develop base map showing sewer <br /> drainage basins. Develop basin maps for delineated basins. <br /> 5.4 Basis of Planning Workshop <br /> Conduct a workshop with City staff to review the results of the previous work tasks and get input <br /> on information prior to development of Plan Chapter 1 — Basis of Planning. Ecology to attend this <br /> workshop. <br /> 5.5 Draft Chapter 1 —Basis of Planning <br /> Develop the Draft Chapter 1 —Basis of Planning by compiling the results of Task 4. Submit draft to <br /> City for review and revise per comments.Submit Draft Plan to Ecology for informal review. Prepare <br /> for and attend coordination meeting with Ecology. <br /> Receivables <br /> • Sewered customer information for 2018-2020 <br /> • Large, non-residential wastewater customers and flows 2018-2020 <br /> • Land-use and service area changes, specifically where there are projected re-zones or <br /> where changes have occurred since last planning efforts <br /> • Existing population numbers for 2020 and future population projections for 2032 and 2042 <br /> • Comments on Draft Chapter 1 <br /> • Comments on Flow Monitoring Plan <br /> Deliverables <br /> • Flow Monitoring Plan <br /> • Draft Chapter 1 — Basis of Planning <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.