My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 4/12/2021
>
Contracts
>
6 Years Then Destroy
>
2024
>
Murraysmith Inc. 4/12/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 2:37:24 PM
Creation date
5/6/2021 2:36:07 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
4/12/2021
Council Approval Date
4/7/2021
End Date
12/31/2024
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
2023 Comprehensive Sewer Plan
Public Works WO Number
3753
Tracking Number
0002889
Total Compensation
$1,495,314.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• City will provide electronic information on collection system (pipe, manholes or other <br /> hydraulic structures) asset condition. No field work or CCTV review time is included in this <br /> scope. <br /> • Pump station condition assessment assumes three (3) Consultant team members (two <br /> from Murraysmith and one from ISI) for 1 hour per station for 33 pump stations. <br /> • Collection and conveyance condition assessment will be formatted to facilitate import into <br /> Cityworks. The City will provide appropriate format. <br /> • The City has information regarding vulnerability and consequence of failure for the <br /> collection system such as a ranking of the most critical system components. <br /> • Budget estimate for risk analysis assumes 40 identified condition and resiliency <br /> deficiencies, which is approximately two per sewer basin. <br /> • Up to four (4) Murraysmith staff will attend brainstorming meeting and each identified <br /> workshop in this task which will be two (2) hours in duration each. Meetings will be virtual. <br /> Task 8 — Water Pollution Control Facility (WPCF) <br /> Objective <br /> Review and summarize previous planning efforts and other City provided information related to <br /> the WPCF. <br /> Work Tasks <br /> 8.1 Existing WPCF <br /> Summarize the information in the WPCF Plan currently being developed by others. <br /> 8.2 Meeting with WPCF Staff <br /> Conduct a meeting with WPCF staff to discuss the findings of the WPCF Plan (completed by others) <br /> to discuss pertinent information. <br /> 8.3 Draft Chapter 4— WPCF <br /> Develop the Draft Chapter 4-WPCF by compiling the Task 7 results. Submit draft to City for review <br /> and revise per comments. <br /> Receivables <br /> • Copy of WPCF Plan in electronic format <br /> • Comments on Draft Chapter 4 <br /> City of Everett MURRAYSMITH 2023 Comprehensive Sewer Plan <br /> March 2021 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.