Laserfiche WebLink
Murraysmith—City of Everett March 2021 <br /> Sewer Utility Financial Plan page 3 <br /> Task 5 I Documentation <br /> Prepare a financial chapter that documents the study process,the City's multi-year rate ordinance and <br /> associated revenue forecast, the revenue requirement methodology, key assumptions, results, and <br /> recommendations. Deliverables to include: <br /> • Draft financial chapter. <br /> » Prepare a draft financial chapter. Work with Murraysmith to provide the chapter in a format <br /> generally consistent with other Plan chapters (to the extent practical). <br /> » Provide an electronic copy of the draft financial chapter and Excel-based tables to <br /> incorporate into the Plan. <br /> • Final financial chapter. <br /> » Incorporate requested changes, as appropriate, and submit the final version of the chapter. <br /> SCHEDULE <br /> Completion of the analysis is based on a variety of issues. These issues include timeliness of receipt <br /> of requested data/ information(especially capital planning data); quality of data; ability to schedule <br /> meetings promptly; and the ability of the City and Murraysmith to provide policy direction for the <br /> study to move forward at key study milestones. A specific project schedule that meets the City's <br /> needs will be developed during the initial project meeting. <br /> Once all data has been received, we can typically generate draft results and have a first review <br /> meeting with Murraysmith and City staff approximately 45 days later. <br /> BUDGET <br /> The budget for the study will not exceed $29,546 unless approved in writing by the City or <br /> Murraysmith. <br /> ���> FCS GROUP www.fcsgroup.com <br />