My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HWA Geosciences Inc. 4/26/2021
>
Contracts
>
6 Years Then Destroy
>
2021
>
HWA Geosciences Inc. 4/26/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 8:45:43 AM
Creation date
5/7/2021 8:45:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HWA Geosciences Inc.
Approval Date
4/26/2021
End Date
12/31/2021
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
40th Pl Landslide Repair/Geotechnical Study
Public Works WO Number
PW 3760
Tracking Number
0002892
Total Compensation
$19,820.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 11,2021 <br /> HWA Proposal No. 2021-P025-21 <br /> 10. Geotechnical Engineering Recommendations:HWA will develop geotechnical <br /> engineering recommendations regarding the stabilization of the observed landside <br /> area. This will include development of Geotechnical recommendations for <br /> retaining walls, as required. <br /> 11. HWA QA/QC: HWA will have the boring logs,analysis, and reports reviewed <br /> by a senior engineer prior to distribution to the team. <br /> 12.Prepare Draft and Final Report: HWA will prepare a draft geotechnical <br /> engineering report summarizing the results of our conclusions and <br /> recommendations. We will finalize our report after receiving any review <br /> comments from the City. <br /> 13.Task Management: HWA will provide project management and correspondence <br /> with the City as necessary. We will provide progress reports with each monthly <br /> invoice,upon request. <br /> ASSUMPTIONS <br /> • One day of limited access drilling will be completed. <br /> • No soil contamination testing,or disposal is assumed. <br /> • Traffic control will consist of drilling along the road shoulder and not require flaggers <br /> • No stormwater analysis will be completed. <br /> • No in-person meetings will be required. <br /> COST ESTIMATE <br /> Based on our understanding of the project and assumed site conditions,we propose to <br /> provide the above geotechnical engineering scope of services on a time and materials <br /> basis not to exceed$19,820. However,if during the project unexpected conditions are <br /> revealed that require alteration of our work scope,or the Client or Owner request <br /> analyses and evaluations which would require a level of effort beyond the scope of our <br /> proposed study and budget,we will contact you immediately to discuss any necessary <br /> modifications to our scope of services and/or budget estimate. A summary of our <br /> estimated costs are presented on the attached spreadsheet. <br /> 0+0 <br /> HWA Scope 3 HWA GeoSciences Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.