Laserfiche WebLink
310.4 Corrosion Engineering <br /> Northwest Corrosion Engineering will provide corrosion engineering services consisting of the <br /> following: <br /> • Address RFI's and submittal review <br /> • Provide 2 days on-site inspection during installation of cathodic protection equipment <br /> • Provide review and comment regarding contractor supplied system commissioning data <br /> • General correspondence and teleconference meetings. <br /> 311. Unanticipated Labor or Expenses <br /> Provide additional services not explicitly included in the scope of services as may be required for <br /> this phase of the project, as requested and authorized by the City. Consultant will provide a fee <br /> estimate for additional services requested by the City. The City will provide written authorization <br /> to proceed with any additional services. <br /> Estimated Schedule <br /> Construction is anticipated to start in June 2021. Based upon the contract duration of 495 working <br /> days, it is estimated that construction will be completed in May or June of 2023. Record drawings <br /> and O&M manuals will be completed approximately two months later based on estimated receipt <br /> of all final consolidated construction markups within one month after construction completion. <br /> Fee Estimate <br /> The detailed fee estimate for Phase 3 is provided in Exhibit B2. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 11 <br /> G\PDX_BD\Clients\Everett,WA1Reservov 2 9-16(16-1910)1Scope-Fee-Contract\Const.Supt.SeMExh A2-Everett Reservoir 2 Rpicmnt CSS Scope.docx <br />