My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 5/4/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
Murraysmith Inc. 5/4/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:54 AM
Creation date
5/14/2021 11:30:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
5/4/2021
Council Approval Date
4/28/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001624
Total Compensation
$600,640.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc 1/16/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
310.4 Corrosion Engineering <br /> Northwest Corrosion Engineering will provide corrosion engineering services consisting of the <br /> following: <br /> • Address RFI's and submittal review <br /> • Provide 2 days on-site inspection during installation of cathodic protection equipment <br /> • Provide review and comment regarding contractor supplied system commissioning data <br /> • General correspondence and teleconference meetings. <br /> 311. Unanticipated Labor or Expenses <br /> Provide additional services not explicitly included in the scope of services as may be required for <br /> this phase of the project, as requested and authorized by the City. Consultant will provide a fee <br /> estimate for additional services requested by the City. The City will provide written authorization <br /> to proceed with any additional services. <br /> Estimated Schedule <br /> Construction is anticipated to start in June 2021. Based upon the contract duration of 495 working <br /> days, it is estimated that construction will be completed in May or June of 2023. Record drawings <br /> and O&M manuals will be completed approximately two months later based on estimated receipt <br /> of all final consolidated construction markups within one month after construction completion. <br /> Fee Estimate <br /> The detailed fee estimate for Phase 3 is provided in Exhibit B2. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 11 <br /> G\PDX_BD\Clients\Everett,WA1Reservov 2 9-16(16-1910)1Scope-Fee-Contract\Const.Supt.SeMExh A2-Everett Reservoir 2 Rpicmnt CSS Scope.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.