My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 5/4/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
Murraysmith Inc. 5/4/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:54 AM
Creation date
5/14/2021 11:30:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
5/4/2021
Council Approval Date
4/28/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001624
Total Compensation
$600,640.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc 1/16/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Complete up to 8 site visits/reports to evaluate foundation subgrade and to confirm <br /> exposed soil conditions are as assumed during design. Provide design consultation and <br /> foundation preparation recommendations based on the actual conditions encountered, <br /> including over excavation of unsuitable soils and placement of foundation materials, as <br /> appropriate. <br /> • Observe activities during demolition of the existing Reservoir 2 concrete liner and provide <br /> recommendations regarding suitability of demolition for long-term drainage and site use. <br /> 310.2 Structural Engineering <br /> Peterson Structural Engineers (Peterson) to provide structural engineering services consisting of <br /> the following: <br /> • Attend a pre pour meeting <br /> • Perform up to 7 structural observation site visits/reports for each reservoir <br /> • Perform up to 4 structural observation site visits/reports for the storage building <br /> • Up to 80 hours for review and response to construction submittals. <br /> • UP to 70 hours for review and response to construction RFIs. <br /> • Prepare structural record drawings <br /> 310.3 Electrical Engineering <br /> R&W Engineering (R&W) will provide electrical engineering services consisting of the following: <br /> • Attend a virtual pre-construction conference, up to 1 on-site meeting, and up to 1 site visit <br /> to review construction progress and answer contractor questions. <br /> • Review of 1 set of original electrical submittals and up to 1 set of resubmittals. <br /> • Review electrical portions of other equipment <br /> • Review up to 5 RFIs and up to 2 change orders <br /> • Attend final walk-through and prepare electrical punch list <br /> • Review electrical portions of O&M manual submittals <br /> • Prepare electrical record drawings <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 10 <br /> G\PDX_BD\Clients\Everett,WA1Reservoir 2 9-16(16-1910)\Scope-Fee-Contract\Const Supt.SeMExh A2-Everett Reservoir 2 Rplcmnt CSS Scope docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.