My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Murraysmith Inc. 5/4/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2023
>
Murraysmith Inc. 5/4/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2021 11:30:54 AM
Creation date
5/14/2021 11:30:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Murraysmith Inc.
Approval Date
5/4/2021
Council Approval Date
4/28/2021
End Date
12/31/2023
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Design Svcs for Replacement of Reservoir 2
Public Works WO Number
UP3658
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001624
Total Compensation
$600,640.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Murraysmith Inc 1/16/2019
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A2 <br /> SCOPE OF SERVICES <br /> CITY OF EVERETT <br /> REPLACEMENT OF RESERVOIR 2 <br /> WORK ORDER #UP3658 <br /> PHASE 3 — CONSTRUCTION SUPPORT SERVICES <br /> • <br /> Background <br /> Murraysmith, Inc. (Consultant) has developed the following scope of services and accompanying <br /> fee estimate to provide services during construction of the Replacement of Reservoir 2 project. <br /> The scope and fee have been developed based on discussions with City of Everett (City) staff and <br /> our understanding of the project. <br /> Project Approach <br /> The engineering services to be provided by Consultant will be accomplished using a phased <br /> approach, as follows. <br /> ■ Phase 1—Preliminary Design (completed) <br /> ■ Phase 2—Final Design and Bidding(near completion) <br /> ■ Phase 3—Construction Support Services (this scope of work) <br /> Based on this approach, the scope of services and fee estimate for the Phase 3 work program are <br /> detailed herein. <br /> Project Understanding and Assumptions <br /> A brief overview of the major proposed improvements is presented below. <br /> ■ 5.0 MG of storage in two (2) 2.5 MG AWWA D110 Type 1 prestressed concrete reservoirs <br /> ■ Approximately 740 LF of steel 36-inch and 48-inch diameter combined inlet water main <br /> pipe <br /> ■ Approximately 3,200 LF of steel 24-inch diameter outlet water main <br /> ■ Approximately 2,700 LF of ductile iron storm and reservoir drainage pipe ranging in size <br /> from 6-inch to 24-inch diameter <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.