Laserfiche WebLink
• Approximately 1,050 LF of sewer force main <br /> • Approximately 1,400-square-foot storage building with small restroom and SCADA room <br /> • New valving to connect Transmission Lines 2, 3, and 4 <br /> • Demolition of the existing 10 MG open concrete Reservoir 2 and Valve House 2 <br /> City and Consultant Roles <br /> The City will take the lead role for all construction administration, management, and inspection <br /> services during construction of the project. The services to be provided by Consultant during <br /> construction and the associated level of effort shown in the fee estimate reflects a supporting role <br /> by Consultant. The amount of time and effort that may be required to fulfill the obligations of this <br /> Scope of Work is subject to factors beyond the control of Consultant and the City. The projected <br /> level of effort proposed herein and included in the fee estimate therefore represents an <br /> "estimate" based upon the collective experience of Consultant and the City for an experienced <br /> and reasonable contractor being awarded the construction contract and completing all <br /> construction work within the construction schedule. <br /> Scope of Services <br /> The Scope of Services for construction support services is divided into the following work tasks. <br /> • Task 301—Project Management and Coordination <br /> • Task 302—Permitting Support <br /> • Task 303—Pre-construction Conference and Construction Meetings <br /> • Task 304—Shop Drawings and Submittals Review <br /> • Task 305—Requests for Information and Change Orders <br /> • Task 306—On-call Construction Observation Support <br /> • Task 307—Project Start-Up <br /> • Task 308—Operation and Maintenance Manuals <br /> • Task 309—Record Drawings <br /> • Task 310—Subconsultant Services <br /> • Task 311-Supplemental Services Management Reserve <br /> 301. Project Management and Coordination <br /> Work under this task includes organizing, managing, and coordinating the services required to <br /> provide the identified construction support services with City staff and general project <br /> management. <br /> City of Everett MURRAYSMITH Replacement of Reservoir 2 <br /> April 2021 2 <br /> G 1PDX_BD\CllentsEEverett,WAVReservorr 2 9-16(16-1910)\Scope-Fee-Contract\Const Supt.ServlExh A2-Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />