My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sazan Group Inc. 6/1/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2022
>
Sazan Group Inc. 6/1/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/4/2021 3:01:53 PM
Creation date
6/4/2021 3:01:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Sazan Group Inc.
Approval Date
6/1/2021
Council Approval Date
5/12/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WFP Emergency Generator Design
Public Works WO Number
WO3587
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0000829
Total Compensation
$284,549.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`� A / A \ <br /> GROUP <br /> Scope of Work Inclusions: <br /> Basic services included for tasks 1-5: <br /> Deliverables for 30%, 60%, 90% and Construction Documents <br /> Demand Load Analysis <br /> Existing equipment to remain analysis <br /> Existing system demolition <br /> SKM Modeling <br /> • Short circuit analysis <br /> • Selective device coordination <br /> • Arc Flash analysis <br /> Distribution equipment and feeder calculations <br /> Duct bank calculations <br /> PUD coordination <br /> AutoCAD drawings <br /> • One-line diagrams <br /> • Demolition drawings <br /> • Site plan <br /> • Floor Plans <br /> • Distribution equipment elevations <br /> • Equipment schedules <br /> • Record drawings <br /> Specifications for equipment procurement and construction <br /> • Performance specifications for monitoring and control systems <br /> Permit application <br /> • Response to plan review comments <br /> Bidding/Construction Administration <br /> • Response to bidding questions <br /> • Equipment submittal review <br /> • Response to requests for information by the contractor <br /> • Pay request review <br /> • Review of contractor redlines <br /> Commissioning/Testing <br /> • Coordination with commissioning agent <br /> • Review and comment on commissioning plan <br /> • Review of equipment test results <br /> • Review of O&M manual <br /> Exclusions <br /> • Integration of generator/switchboard controls and monitoring <br /> • Integration with existing site monitoring and controls <br /> • Environmental studies <br /> • Energy use analysis <br /> • Temporary construction power distribution design <br /> • Acoustical calculations <br /> • Cathodic protection design <br /> • Architectural for Location 2, Building 1250 and Location 3, Backwash Pump Station <br />
The URL can be used to link to this page
Your browser does not support the video tag.