NA / AEI <br /> GROUP <br /> STRUCTURAL <br /> Scope Assumptions: <br /> 1. Design will include two free-standing canopies.These will serve a fuel tank at Location 1 and fuel tank at Location <br /> 2. Each canopy is expected to be approximately 400 SF, or less, in order to cover the equipment and access space <br /> around the equipment. <br /> 2. Design will also include concrete foundations pads for each equipment location described above. <br /> 3. Canopy framing (materials, beam spacing, column spacing) and pad concepts will be the same at the two locations. <br /> A single set of details and a single specification package is expected to cover all three locations. <br /> 4. Minor structures (bollards, stanchions, pad-supported posts) may be required for the protection of the equipment <br /> or for the support of control panels at each location. <br /> 5. Geotechnical requirements, including piles, that applied to the previous building concept are expected to apply <br /> to the new canopies and foundation pads. Verification will be provided by the City of Everett of geotechnical <br /> conditions at the new locations. <br /> 6. Building revisions at Location 1 are expected to consist of a roughly 200 SF, CMU-framed addition with a steel <br /> beam and metal deck roof structure. The addition will infill the re-entrant corner of the existing building, <br /> resulting in a rectangular final footprint. A double-wall is expected along the two side adjoining the existing <br /> building, to provide lateral support. The buildings are expected to be connected,with the addition seismically <br /> buttressing the existing building. Upgrade of the existing building is not expected, based on the buttressing <br /> from the addition, although added walls and lintel beams may be required at some locations,to offset wall lost <br /> at the new louver openings. If upgrades are required to the existing building, beyond those required at the <br /> louvers, these will be provided as an additional service. <br /> 7. Equipment skids, sleepers, or other equipment base structures will be provided by the equipment supplier and are <br /> outside the scope of this proposal. <br /> 8. Support of conduits, piping, or equipment from the canopies, if required, are not included. <br /> 9. Structural engineering design, as required to provide an additional canopy design, added shear walls at the western <br /> face of the existing Location #1 building, and the added pile-supported generator pad at Location #2. <br /> CIVIL <br /> Scope Assumptions: <br /> Site paving and the canopy areas for the new generator and fuel tanks are not greater than 5,000 SF,the followings <br /> are the Civil scope would be needed: <br /> Location 1: Site grading, pavement patching, and drainage for new fuel tank &canopy. <br /> Location 2: Site grading, pavement patching, and drainage for new fuel tank&canopy. <br /> 2,000 SF of new and replacement impervious areas is the threshold for on-site stormwater management requirements, <br /> which likely can be met or exempted (with helps from Owner) because of the existing site conditions. 5,000 SF is the <br /> threshold for stormwater detention requirements. <br /> ARCHITECTURAL <br /> Scope Assumptions: <br /> 1. Architectural field investigation of existing building and site. Prepare architectural CAD base drawings of existing <br /> conditions for use in design and contract documents. <br /> 2. Expand building 650 to house a new generator and day tank and Switchgear <br /> a. Architectural design/detailing of wall and roof system in coordination with structural engineers <br /> b.Design drawings, detailing and specifications for roofing, doors and hardware, louvers, and finishes. <br /> 3. Exterior design and detailing in coordination with structural engineers as required, compatible with existing <br /> building. <br /> 4. Architectural preliminary design cost estimate. <br />