My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 6/1/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Brown and Caldwell Inc. 6/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 1:40:08 PM
Creation date
6/4/2021 3:10:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
6/1/2021
Council Approval Date
5/12/2021
End Date
12/31/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
WO3755
Tracking Number
0002939
Total Compensation
$257,852.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell Inc. 3/9/2022 Amendment 1
(Contract)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br /> Meetings <br /> • Design comment review call. Assume attended by five BC staff, with a duration of two hours, <br /> one each at preliminary(30%) and intermediate design (60%) stages. <br /> • Site visit during design as needed.Assume attended by two BC staff, with a duration of two <br /> hours on site. <br /> Work Products <br /> • Preliminary Design (30%) <br /> • Intermediate Design (60%) <br /> • CAD files of intermediate designs. <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.