My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2514 RAINIER AVE 2022-03-01
>
Address Records
>
RAINIER AVE
>
2514
>
2514 RAINIER AVE 2022-03-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2022 10:45:56 AM
Creation date
6/9/2021 10:17:56 AM
Metadata
Fields
Template:
Address Document
Street Name
RAINIER AVE
Street Number
2514
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
541
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH MIDDLE SCHOOL MODERNIZATION <br />Everett Public Schools <br />SECTION 014100 - AIR BARRIER SYSTEM <br />PART 1 -GENERAL <br />1.1 SECTIONS INCLUDES <br />014100 <br />AIR BARRIER SYSTEM <br />A. This section includes administrative and procedural requirements for <br />accomplishing an airtight building enclosure that controls infiltration or <br />exfiltration of air. <br />1. The airtight components of the building enclosure and the joints, <br />junctures and transitions between materials, products, and <br />assemblies forming the air -tightness of the building enclosure are <br />called "the air barrier system". Services include coordination between <br />the trades, the proper scheduling and sequencing of the work, <br />preconstruction meetings, inspections, tests, and related actions, <br />including reports performed by Contractor, by independent agencies, <br />and by governing authorities. They do not include contract <br />enforcement activities performed by Architect. <br />2. The Contractor shall ensure that the intent of constructing the <br />building enclosure with a continuous air barrier system to control air <br />leakage into, or out of the conditioned space is achieved. The air <br />barrier system shall have the following characteristics: <br />a. It must be continuous, with all joints sealed. <br />b. It must be structurally supported to withstand positive and <br />negative air pressures applied to the building enclosure. <br />C. Connection shall be made between: <br />1) Foundation and walls. <br />2) Walls and windows or doors. <br />3) Different wall systems. <br />4) Wall and roof. <br />5) Wall and roof over unconditioned space. <br />6) Walls, floor and roof across construction, control and <br />expansion joints. <br />7) Walls, floors and. roof to utility, pipe and duct <br />penetrations. <br />3. Air Barrier Penetrations: All penetrations of.the air barrier and paths <br />of air infiltration / exfiltration shall be sealed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.