Laserfiche WebLink
INFORMATION FOR THE DEVELOPER (applies to revision — portable placement): <br />FIRE DEPARTMENT — JIM VENTURO 425.257.8100 <br />1. Access - O.K. as shown on the site plan reviewed. <br />2. Fire Alarm System - An approved automatic fire detection system shall be provided as <br />required by City Ordinance No. 3021-07, Chapter 16.76, of the Everett Municipal Code. <br />Plans for such system shall be submitted to the City of Everett Permit Services at 3200 Cedar <br />Street 2nd Floor, Everett, WA for review and approval prior to installation. Submittal shall <br />include cut sheets of all equipment intended for use.. Appropriate trip tests, witnessed by a <br />Fire Department Inspector, shall be performed, along with a certificate of completion, prior <br />to final acceptance of the system. <br />Fire alarm systems shall be installed according to NFPA Chapter 72, 2013 Edition. <br />Installation of fire alarm components, including basic wiring, may not commence <br />before plans are approved by the Fire Department Plan Reviewer. Fire alarm drawings <br />must be professionally rendered, in sufficient detail, and must be internally consistent. Riser <br />diagrams must match installation plans and load calculations. Components must be listed <br />and approved for use together. Changes to plans must include new drawings and calculations <br />and must be approved by the Fire Department Plan Reviewer prior to installation. Fire alarm <br />installation is subject to field inspection by a Fire Department Inspector. An approved set of <br />plans and the City of Everett Permit Services electrical permit must be present for any <br />installation inspection. <br />Fire alarm systems shall be installed under permit of the City of Everett Permit Services. <br />Electrical inspections and approval are required prior to calling for acceptance tests. Call <br />(425) 257-8810 for permit information. <br />The absence of monitoring for the alarm system will be cause for postponing Fire <br />Department inspection and testing and shall result in denial of occupancy. <br />A copy of NFPA 72 Record of Completion form must be filled out prior to final occupancy <br />(NFPA 72, 2013 Edition, Chapter 7, pages 107-147). 2015 IFC, 907.7.2 <br />Call for design requirements per Authority Having Jurisdiction. <br />Automatic smoke detection is required. <br />On the address side of the building, a weatherproof horn strobe shall be added to the <br />fire alarm system. <br />Portables shalt have'fire alarm systems. <br />S U17-o08 <br />Page 2 of <br />