1 3. <br /> amec <br /> foster <br /> wheeler <br /> It should be noted that the explorations performed and used for this evaluation reveal subsurface <br /> conditions only at discrete locations across the project site, and that actual conditions in other <br /> locations could vary. Furthermore, the nature and extent of these variations would not become evident <br /> until additional explorations are performed or until construction activities have begun. If significant <br /> variations are observed, we may need to modify the conclusions and recommendations contained in <br /> 1 this report to reflect actual site conditions encountered. <br /> 3.0 SITE CONDITIONS <br /> This section presents our observations, measurements, findings, and interpretations regarding <br /> existing development, surface, soil, groundwater, and seismic conditions at the project site. <br /> 3.1 SURFACE CONDITIONS <br /> The school campus is generally divided into three sections: north, central and south areas. The <br /> northern and central sections are separated by a 1- to 4-foot-high concrete retaining wall. The <br /> northern section of the campus contains the athletic fields. The central section houses the main <br /> campus, which comprises school building structures, bus lanes, and two small parking lots. The <br /> southern section contains a parking lot and tennis courts. <br /> All three sections of the school campus are relatively level. Elevation around the outer perimeter of <br /> the northern section averages 81 feet and increases to approximately elevation 82 feet at the center <br /> of the athletic field. The central section dips gently from elevations 80 feet at the east property line to <br /> elevations 76 feet at the west property line. The southern section dips gently east to west from <br /> elevation 79 to 75.5. <br /> Based on our review of the original limited grading plans provided, our exploration results, and visual <br /> assessment, it appears that topography at the school campus was balanced by a series of cuts and <br /> fills. Soil cut from the north-northeastern portion of the athletic fields appears to have been placed in <br /> the south and southwest area of the fields. Our explorations indicate 5 feet of fill had been placed on <br /> the athletic fields. The central area of the site containing the school buildings also appears to have <br /> been leveled and graded through a series of minor cuts and fills. Our explorations indicate <br /> approximately 3 feet of fill was placed in the vicinity of the small parking lot at the southwest corner of <br /> the school campus. A review of an earlier site survey indicates fill up to 5 feet thick was placed in the <br /> south portion of the site. The parking lot and tennis courts south of 26th Street appear to have been <br /> graded with approximately 5.5 feet of fill placed to reach existing grade. <br /> Amec Foster Wheeler <br /> Project No.6-917-18116-0 3 <br /> 111 \\Sea-fs1\WordProc\ Projects\18000s\18116 Everett School District\Geotech Report\Revised\2017_10-19_Everett Middle School Geotech_Sx.docx <br />