Laserfiche WebLink
„ ,_ <br /> 4,4 <br /> ,,,,,,,, <br /> I <br /> amec <br /> foster <br /> Wheeler <br /> 6. Observe the installation of all perimeter drains, wall drains, and capillary break layers to <br /> verify conformance with construction plans. <br /> 7. Provide geotechnical engineering support by reviewing submittals, answering questions, <br /> and commenting on any earthwork change requests that arise during construction. <br /> Upon request, we will submit a proposal for providing these construction monitoring, inspection, and I <br /> testing services. A proposal is best prepared after the project plans and specifications have been <br /> approved for construction and a preliminary construction schedule is available. <br /> 6.0 LIMITATIONS <br /> This report has been prepared for the exclusive use of Everett School District and their consultants for I <br /> specific application to this project, in accordance with generally accepted geotechnical engineering <br /> practice. The conclusions, recommendations, and opinions presented in this report are based, in part, 111 <br /> on the explorations Amec Foster Wheeler performed and used for this study and on information <br /> provided for the proposed project. Geotechnical information obtained from borings represents I <br /> conditions at specific locations at the time of the explorations and may not reflect conditions at other <br /> locations and different times. If variations in subgrade conditions are observed at a later time, <br /> additional explorations may be needed, and we may need to modify this report to reflect those I <br /> changes. We are available to provide geotechnical engineering throughout the design process and to <br /> perform monitoring services throughout construction. We recommend that a qualified geotechnical I <br /> engineer be present to observe all earthwork and foundation preparation. <br /> 7.0 REFERENCES I <br /> James P. Minard, 1985. Geologic Map of The Everett 7.5 minute Quadrangle, Snohomish County, <br /> Washington. I <br /> Washington State Department of Transportation (WSDOT). 2012. Standard Specifications for Road, <br /> Bridge, and Municipal Construction 2012. Publication M41-10. I <br /> City of Everett Stormwater Management Manual, (2010) <br /> I <br /> I <br /> I <br /> Amec Foster Wheeler I <br /> 22 Project No.6-917-18116-0 <br /> \\Sea-fs1\WordProc\_Projects\18000s\18116 Everett School District\Geotech Report\Revised\2017_10-19_Everett Middle School Geotech_Sx.docx <br />