Laserfiche WebLink
amec 4; <br /> foster :.,.. <br /> wheeler <br /> GEOTECHNICAL ENGINEERING REPORT <br /> Everett North Middle School Campus Redevelopment <br /> 2514 Rainer Avenue <br /> Everett, Washington <br /> I <br /> 1.0 SITE AND PROJECT DESCRIPTION <br /> This report presents the geotechnical evaluation for planned improvements at the Everett North <br /> Middle School Campus. The project site is an active school located at 2514 Rainer Avenue in Everett, <br /> Washington (Figure 1). The school campus is generally divided into three areas, as shown on <br /> Figure 2: <br /> ► The northern area is an athletic field. <br /> ► The central area is the main school campus comprising the existing school buildings, two <br /> small parking lots, bus access lanes, covered play area, and associated campus <br /> infrastructure. <br /> ► The southern area is located across 26th Street and consists of a parking lot and tennis <br /> courts. <br /> Based on the construction plans provided by NAC Architecture, redevelopment plans entail demolition <br /> of the majority of the existing structures and associated infrastructure in preparation for campus <br /> redevelopment and the construction of a new two-story school building. The existing gymnasium will <br /> not be demolished, but will be integrated into the new school building. Bus access lanes and parking <br /> areas will be relocated to the west side of the new school building, while walkways and utilities will be <br /> reconfigured to support the new campus layout. Athletic field improvements call for a football field in <br /> the east half of the existing athletic field with a baseball field and running track in the west half. Both <br /> improvements call for synthetic turf surfaces and an underdrain system. The parking lot and tennis <br /> courts across 26th Street will remain unchanged, except the tennis court surface will be converted into <br /> additional parking stalls. <br /> The conclusions and recommendations contained in this report are based on our understanding of the <br /> school campus redevelopment plans as derived from construction plans and verbal information <br /> supplied to us by the Everett School District (ESD) design team. As the design process moves <br /> forward, any reconfiguration, relocation, and/or addition of buildings, structures, or supporting <br /> infrastructures from the plans provided may require further review of our engineering <br /> recommendations and modifications to this report. <br /> Amec Foster Wheeler <br /> Project No.6-917-18116-0 1 <br /> \\Sea-fs1\WordProc\ Projects\18000s\18116 Everett School District\Geotech Report\Revised\2017_10-19_Everett Middle School Geotech_Sx.docx <br />