Laserfiche WebLink
• <br /> Popach Short Plat—2 Lots <br /> Table V-4.5.2(22) Maintenance Standards - Permeable Pavement <br />• (continued) <br /> Recommended Fre- Condition <br /> quency a when Main <br /> Component tenance is Action Needed (Procedures) <br /> Inspection Routine Needed <br /> Maintenance (Standards) <br />• <br /> other materials from per- <br /> meable pavement or other <br /> adjacent surfacing <br /> . Check if surface elevation <br />• adjacent per- of planted area is too high, <br /> vious areas or slopes towards pave- <br /> Pavements, deposits soil ment, and can be regraded <br /> all mulch or sed- (prior to regrading, protect <br /> iment on pay- <br /> permeable pavement by <br /> covering with temporary <br />• ing plastic and secure covering <br /> in place) <br /> • Mulch and/or plant all <br /> exposed soils that may <br /> erode to pavement surface <br />• Clean surface debris from pave- <br /> ment surface using one or a com- <br /> bination of the following <br /> methods: <br />• • Remove sediment, debris, <br /> trash,vegetation, and other <br /> debris deposited onto pave- <br /> Porous ment(rakes and leaf <br /> asphalt or A or B None (routine blowers can be used for <br />• pervious maintenance) removing leaves) <br /> concrete . Vacuum/sweep permeable <br /> paving installation using: <br /> Walk-behind vacuum <br /> (sidewalks) <br />• 0 High efficiency regen- <br /> erative air or vacuum <br /> sweeper(roadways, <br /> parking lots) <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume V- Chapter 4-Page 888 <br /> WESTERN ENGINEERS,INC. 23 PROJECT:15-1463-A <br />• <br />