Laserfiche WebLink
• <br /> Popach Short Plat—2 Lots <br /> Table V 4.5.2(5) Maintenance Standards - Catch Basins (continued) <br />• Results <br /> Maintenance <br /> Defect Conditions When Maintenance is Expected <br /> When Main <br /> Component Needed <br /> tenance is <br /> performed <br /> Working frame have less than 1/2 inch of thread. proper tools. <br />• <br /> One maintenance person cannot remove lid Cover can be <br /> Cover Difficult after applying normal lifting pressure. removed by <br /> one main- <br /> to Remove <br /> (Intent is keep cover from sealing off access tenance per <br /> to maintenance.) son. <br />• Ladder meets <br /> design stand- <br /> Ladder Rungs Ladder is unsafe due to missing rungs, not ards and <br /> Ladder Unsafe securely attached to basin wall, mis- allows main- <br /> alignment, rust, cracks, or sharp edges. tenance per- <br />• son safe <br /> access. <br /> Grate open- <br /> Grate opening ing meets <br /> Unsafe Grate with opening wider than 7/8 inch. design stand- <br />• ards. <br /> Metal Grates Trash and Trash and debris that is blocking more than Grate free of <br /> (If ) lic trash and <br /> Debris 20% of grate surface inletting capacity. <br /> able <br /> able) debris. <br /> Grate is in <br />• Damaged or Grate missing or broken member(s)of the place and <br /> Missing. grate. meets design <br /> standards. <br /> Table V 4.5,2(22) Maintenance Standards - Permeable Pavement <br />• Recommended Fre- Condition <br /> quency a when Main- <br /> Component tenance is Action Needed (Procedures) <br /> Inspection Routine Needed <br /> Maintenance (Standards) <br />• Surface/Wearing Course <br /> Permeable A,S !Runoff from • Clean deposited soil or <br />• 2014 Stormwater Management Manual for Western Washington <br /> Volume V-Chapter 4 -Page 887 <br /> WESTERN ENGINEERS,INC. 22 PROJECT:15-1463-A <br />• <br />