Laserfiche WebLink
Daily Field Report <br /> • , ate Office <br /> 17522rBothell Way Northeast Project No: 2016-072 <br /> Bothell,Washington 98011 Report No: 10 <br /> RILEYGROUP 425.415.0551 RGI rep: Kristina Weller <br /> www.riley-group.com <br /> Date: Nov 22,2019 Day Friday <br /> Permit No: PWW1909-002 Page No. 1 of 1 <br /> Project: Glenwood Retaining Wall Subject: Wall Construction <br /> Location: 4841 Glenwood Avenue, Everett Contractor: Dir-T Works <br /> Client Name: Isha Darby Superintendent Mike Gerrodette <br /> &Address: 1501 150th Place Southwest Visitors: <br /> Lynwood,WA 98057 Weather: Cloudy <br /> OBSERVATIONS <br /> As requested, a RGI representative was on site today to observe the following: <br /> Contractor completed the placement of the bark over the fabric and grading in front of the wall.The <br /> fence posts and concrete work are all that remain to be completed. <br /> t ..._ "..v T .-III, •, . <br /> Based on observations,the wall was constructed <br /> t' i; ;.lilt I `� <br /> according to plans and recommendations. The <br /> structural portions of the wall are complete including _ . I I IN <br /> Virt;*" sk A Ili Wry' S ', <br /> the blocks placed in accordance with the design, , <br /> drainage and backfilled with compacted soils. `~ " ''' ;$ ''`� <br /> The slope in the front of the wall is compelte to reduce h`` tt. <br /> '` �. _, " ', _ <br /> the wall height to the required 6 feet. Drain rock was c �,�' , K -=- _ -> =; <br /> placed along the toe and routes drainage off the slope = K -� ` = ' <br /> towards the catch basin. 4, * � � - `.; <br /> `,� r"w�le�a a 'z� 6, <br /> t ,. :-..;',..V. �° � .( ' a ;`) _ Zs,MS_ `_ 4 <br /> . `g � <br /> 't sir, , , <br /> - t y t {y �Ca !q } t �N1 <br /> Fall Protection Fence Completed 12/10 ' ;5- - °;'tIgt-01 `' ` <br /> RGI Rep Sign: Copies to: <br /> The Riley Group, Inc. <br />