Laserfiche WebLink
I <br /> The following inspection/maintenance schedules shall be utilized to ensure the ESC facilities are <br /> functioning as designed: <br /> Construction Entrances <br /> • The construction entrances shall be inspected once a week during the dry season and after I <br /> every rainfall event during the wet season. If the entrance is not preventing sediment from <br /> being tracked onto adjacent pavement,then alternate measures to keep the pavement free <br /> of sediment shall be used. This may include street sweeping, an increase in the dimension <br /> of the entrance, or the installation of a wheel wash. <br /> • Any quarry spans that are loosened from the pad that end up on the roadway shall be <br /> removed immediately. Additional rock shall be added periodically to maintain proper <br /> function of the pad. <br /> • If vehicles are entering or exiting the site at points other than the approved entrances, <br /> temporary fencing shall be installed to control traffic. I <br /> Sediment Trap <br /> • The sediment trap shall be inspected once a week during the dry season and after every <br /> rainfall event during the wet season. <br /> • Sediment shall be removed from the trap when it reaches 1 foot in depth. <br /> • The staff gauge shall be inspected and replaced if damaged then repositioned after <br /> dredging. Any damage to slopes shall be repaired. <br /> • Check pond slopes for raveling. Concentrated flows shall not be allowed to flow down the <br /> pond slopes without providing rock armoring. <br /> • Inspect outlet to ensure it is functioning properly and is not plugged. <br /> Temporary and Permanent Seeding <br /> • Seeding may be used throughout the project on disturbed areas. During the dry season, <br /> areas that have reached final grade, or are not being actively worked, shall be seeded <br /> within 15 days. Seeded areas shall be supplied with adequate moisture, but not watered toIII <br /> the extent that it causes runoff. <br /> • During the wet season, all disturbed areas not being actively worked shall be seeded or <br /> stabilized with mulch or plastic sheeting. <br /> • To prevent seed from being washed away, confirm that all other approved <br /> erosion/sedimentation control facilities have been installed and are functioning properly. <br /> • Any seeded areas that fail to establish 80 percent cover(100 percent cover for areas that <br /> receive sheet or concentrated flows)shall be reseeded. If reseeding is ineffective, an <br /> alternate method shall be used. <br /> • Seeded areas shall be inspected after every rainfall event during the wet season. Any <br /> areas that experience erosion shall be reseeded and protected by mulch. If the erosion <br /> problem is drainage related,the problem shall be fixed and the eroded area reseeded and <br /> protected by mulch. <br /> • Seeding shall not be used in areas subject to heavy vehicular traffic. <br /> Mulching I <br /> • Mulching shall be inspected once a week during the dry season and after every rainfall <br /> event during the wet season. I <br /> • Mulch shall be inspected to verify that the proper thickness is being maintained if <br /> applicable. <br /> Construction Stormwater Pollution Prevention Pla <br /> n OCICIEI <br /> Everett 7-Eleven 8 <br /> 2180309.10 <br />