My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> • Any areas that experience erosion shall be re-mulched and/or protected with a net or <br /> blanket. If the erosion problem is drainage related, the problem shall be fixed and the <br /> eroded area re-mulched. <br /> Plastic Covering <br /> • Plastic sheeting shall be inspected once a week during both the wet and dry season. <br /> • Torn sheets must be replaced and open seams repaired. <br /> • If the plastic begins to deteriorate due to ultraviolet radiation, it must be completely <br /> removed and replaced. <br /> • When the plastic is no longer needed, it shall be completely removed. <br /> • If tires are used to weight down the plastic sheeting,they must be disposed of properly. <br /> IFilter Fabric Fence <br /> • Any damage shall be repaired immediately. <br /> • If concentrated flows are evident uphill of the fence, they must be intercepted and <br /> conveyed to a sediment pond. <br /> • Check the uphill side of the fence for signs of the fence clogging and acting as a barrier to <br /> flow, and causing channelization of flows parallel to the fence. If this occurs, replace the <br /> fence or remove the trapped sediment. <br /> • Sediment deposits shall be removed when the deposit reaches approximately one-third the <br /> height of the silt fence, or a second silt fence shall be installed. <br /> • If the filter fabric(geotextile)has deteriorated due to ultraviolet breakdown, it shall be <br /> replaced. <br /> If the ESC facilities are damaged, or if the Engineer of Record or City determines that existing <br /> controls are inadequate, the Contractor shall install additional measures as required. <br /> The maintenance inspection report will be made after each inspection. Copies of the report forms <br /> to be completed by the Construction SWPPP Coordinator are included as Appendix C of this <br /> report. Completed forms will be provided to the City Inspector and will also be maintained onsite <br /> during the entire construction project. If construction activities or design modifications are made <br /> to the site plan that could impact stormwater or if the Engineer of Record determines that the <br /> measures are not adequate to prevent erosion and the discharge of sediment from the site <br /> (based on turbidity measurements), this Construction SWPPP will be amended appropriately. <br /> I The amended Construction SWPPP will have a description of the new activities that contribute to <br /> the increased pollutant loading and the planned source control activities. <br /> All temporary Construction SWPPP BMPs shall be removed within 30 days after achieving final <br /> site stabilization. <br /> 7.12 Manage the Project <br /> The following practices will be required during construction to properly manage activities: <br /> ,� • Comply with seasonal work limitations. <br /> • Inspect, maintain, and repair BMPs. <br /> • Identify a CESCL. <br /> I • Maintain the Construction SWPPP onsite at all times, including narrative and plans. <br /> Construction Stormwater Pollution Prevention Plan <br /> Everett 7-Eleven 9 OCICIIII <br /> 2180309.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.