i <br /> Erosion control procedures, as described in this Construction SWPPP and illustrated on the <br /> design plans, if properly implemented, should mitigate anticipated erosion effects from the <br /> proposed filling on the project site. <br /> The success of erosion control measures is usually related to the Contractor's attention to <br /> maintenance of such measures. However, in some instances, even with proper attention being <br /> paid to erosion control,measures such as those shown on the plans are unable to prevent the <br /> discharge of turbid water. In this event, secondary measures may be required such as <br /> Construction Stormwater Chemical Treatment(BMP C250)or Construction Stormwater Filtration <br /> (BMP C251). Additional cover measures may be implemented, including Sodding (BMP C124)or <br /> Polyacrylamide for Soil Erosion Protection (BMP C126). Descriptions of the above-listed BMPs <br /> are provided in Volume II of the SWMMWW and will be provided to the Contractor, if required. <br /> 7.13 Protect Low Impact Development BMPs <br /> There are no Low Impact Development BMPs proposed with this project. <br /> 8.0 Construction Sequence and Phasing <br /> The proposed improvements will be completed in a single phase. A general construction I <br /> sequence is as follows: <br /> 1. Schedule and attend a pre-construction meeting with City of Everett, owner, and engineer. I <br /> 2. Flag or fence all clearing limits. <br /> 3. Install construction entrance and erosion control measures. I <br /> 4. Perform mass grading per plans. <br /> 5. As areas are disturbed/cleared, provide TESC measures. I <br /> 6. Maintain erosion control measures in accordance with City standards and manufacturer's <br /> recommendations. I <br /> 7. Relocate erosion control measures or install new measures so that, as site conditions <br /> change, the erosion and sediment control is always in accordance with City erosion and <br /> sediment control standards. <br /> 8. Upon completion of the project, stabilize all disturbed areas and remove BMPs upon <br /> approval of the owner or engineer. I <br /> 9.0 Construction Schedule <br /> Construction is scheduled to begin in summer of 2019. 1 <br /> 10.0 Financial/Ownership Responsibilities <br /> A reclamation guarantee will be provided at the owner's expense. An approximate cost of the <br /> guarantee is shown below: <br /> $1,500 per disturbed acre* 1.32 acres =$1,980(use$2,000) I <br /> 1 <br /> Construction Stormwater Pollution Prevention Plan <br /> Everett 7-Eleven 10 0000 <br /> 2180309.10 <br />