My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Erosion control procedures, as described in this Construction SWPPP and illustrated on the <br /> design plans, if properly implemented, should mitigate anticipated erosion effects from the <br /> proposed filling on the project site. <br /> The success of erosion control measures is usually related to the Contractor's attention to <br /> maintenance of such measures. However, in some instances, even with proper attention being <br /> paid to erosion control,measures such as those shown on the plans are unable to prevent the <br /> discharge of turbid water. In this event, secondary measures may be required such as <br /> Construction Stormwater Chemical Treatment(BMP C250)or Construction Stormwater Filtration <br /> (BMP C251). Additional cover measures may be implemented, including Sodding (BMP C124)or <br /> Polyacrylamide for Soil Erosion Protection (BMP C126). Descriptions of the above-listed BMPs <br /> are provided in Volume II of the SWMMWW and will be provided to the Contractor, if required. <br /> 7.13 Protect Low Impact Development BMPs <br /> There are no Low Impact Development BMPs proposed with this project. <br /> 8.0 Construction Sequence and Phasing <br /> The proposed improvements will be completed in a single phase. A general construction I <br /> sequence is as follows: <br /> 1. Schedule and attend a pre-construction meeting with City of Everett, owner, and engineer. I <br /> 2. Flag or fence all clearing limits. <br /> 3. Install construction entrance and erosion control measures. I <br /> 4. Perform mass grading per plans. <br /> 5. As areas are disturbed/cleared, provide TESC measures. I <br /> 6. Maintain erosion control measures in accordance with City standards and manufacturer's <br /> recommendations. I <br /> 7. Relocate erosion control measures or install new measures so that, as site conditions <br /> change, the erosion and sediment control is always in accordance with City erosion and <br /> sediment control standards. <br /> 8. Upon completion of the project, stabilize all disturbed areas and remove BMPs upon <br /> approval of the owner or engineer. I <br /> 9.0 Construction Schedule <br /> Construction is scheduled to begin in summer of 2019. 1 <br /> 10.0 Financial/Ownership Responsibilities <br /> A reclamation guarantee will be provided at the owner's expense. An approximate cost of the <br /> guarantee is shown below: <br /> $1,500 per disturbed acre* 1.32 acres =$1,980(use$2,000) I <br /> 1 <br /> Construction Stormwater Pollution Prevention Plan <br /> Everett 7-Eleven 10 0000 <br /> 2180309.10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.