My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> BMP C160: Certified Erosion and Sediment Control Lead <br /> Purpose , <br /> The project proponent designates at least one person as the responsible representative <br /> in charge of erosion and sediment control (ESC), and water quality protection. The des- ' <br /> ignated person shall be the Certified Erosion and Sediment Control Lead (CESCL)who <br /> is responsible for ensuring compliance with all local, state, and federal erosion and sed- <br /> iment control and water quality requirements. 1 <br /> Conditions of Use <br /> A CESCL shall be made available on projects one acre or larger that discharge storm- <br /> water to surface waters of the state. Sites less than one acre may have a person without <br /> CESCL certification conduct inspections; sampling is not required on sites that disturb t <br /> less than an acre. <br /> . The CESCL shall: , <br /> . Have a current certificate proving attendance in an erosion and sediment con- <br /> trol training course that meets the minimum ESC training and certification <br /> requirements established by Ecology (see details below). <br /> Ecology will maintain a list of ESC training and certification providers at: <br /> http://www.ecy.wa.gov/programs/wg/stormwater/cescl.html <br /> 4R <br /> ▪ Bea Certified Professional in Erosion and Sediment Control (CPESC); for <br /> additional information go to: http://www.envirocertintl.org/cpesc! <br /> Specifications <br /> . Certification shall remain valid for three years. <br /> . The CESCL shall have authority to act on behalf of the contractor or developer and <br /> shall be available, or on-call, 24 hours per day throughout the period of con- <br /> struction. ' <br /> • The Construction SWPPP shall include the name, telephone number,fax number, <br /> and address of the designated CESCL. I <br /> . A CESCL may provide inspection and compliance services for multiple con- <br /> struction projects in the same geographic region. i <br /> Duties and responsibilities of the CESCL shall include, but are not limited to the fol- <br /> lowing: <br /> 1 <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume II- Chapter 4 -Page 325 <br />
The URL can be used to link to this page
Your browser does not support the video tag.