My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7500 HARDESON RD 2021-06-09
>
Address Records
>
HARDESON RD
>
7500
>
7500 HARDESON RD 2021-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2021 3:46:41 PM
Creation date
6/9/2021 3:44:50 PM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7500
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> . Maintaining permit file on site at all times which includes the Construction SWPPP <br /> and any associated permits and plans. <br /> . Directing BMP installation, inspection, maintenance, modification, and removal. <br /> . Updating all project drawings and the Construction SWPPP with changes made. <br /> . Completing any sampling requirements including reporting results using <br /> WebDMR. <br /> I . Keeping daily logs, and inspection reports. Inspection reports should include: <br /> . Inspection date/time. <br /> . Weather information; general conditions during inspection and approximate <br /> amount of precipitation since the last inspection. <br /> . A summary or list of all BMPs implemented, including observations of all <br /> erosion/sediment control structures or practices. The following shall be <br /> noted: <br /> ' 1. Locations of BMPs inspected. <br /> 2. Locations of BMPs that need maintenance. <br /> 3. Locations of BMPs that failed to operate as designed or intended. <br /> 4. Locations of where additional or different BMPs are required. <br /> • Visual monitoring results, including a description of discharged stormwater. <br /> The presence of suspended sediment, turbid water, discoloration, and oil <br /> sheen shall be noted, as applicable. <br /> . Any water quality monitoring performed during inspection. <br /> . General comments and notes, including a brief description of any BMP <br /> repairs, maintenance or installations made as a result of the inspection. <br /> . Facilitate, participate in, and take corrective actions resulting from inspections per- <br /> formed by outside agencies or the owner. <br /> BMP 2: Scheduling <br /> ■ Purpose <br /> ■ Sequencing a construction project reduces the amount and duration of soil exposed to <br /> erosion by wind, rain, runoff, and vehicle tracking. <br /> Conditions of Use <br /> The construction sequence schedule is an orderly listing of all major land-disturbing <br /> activities together with the necessary erosion and sedimentation control measures <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume Il- Chapter 4 -Page 326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.