Laserfiche WebLink
SCALE <br /> SE 1 /4, NE 1 /4 SEC 11 , T. 28 N., R. 4 E., W.M. <br /> 10 0 10 20 <br /> , CD „ . , . <br /> . ,,, • , . <br /> FEET <br /> , s , <br /> . . <br /> ,, . <br /> - ,. , , ,,, ,, , <br /> J ARCH TECTUERAL LTERS AND SEE <br /> Z <br /> SAWCUT ALONG EXISTING _ - STRUCTURAL DRAWINGS <br /> 2Ax2' TOOLED JOINT CT BUS SHELTERS SEE .PATTERN (TYP) <br /> ARCHITECTURAL AND CODE BLUE <br /> r STRUCTURAL DRAWINGS 2 x2� TOOLED�(7Y[?) .{ KIOSK STATION I <br /> EXISTING JOINT (TYP) QS a (TYP) '> I I <br /> ©(TYp) LUMINAIRE TO ®(7YP) a - I I D <br /> in O REMAIN ., © - ---- --- --- _1 I I I <br /> il <br /> •I <br /> g t L 4 � � ..✓•:!USSMELTER }/ti1 •// / 1') _Jam:a • <br /> !, (TYP) L B I J C I <br /> L v <br /> • <br /> N I '- RELOCATE EXISTING LUMINAIRE & . RELOCATE EXISTING LUMINAIRE. \ 1 �I1,,// • I • I II • I. • <br /> ���\ <br /> G I TRASH RECEPTACLE. CONTRACTOR TO - CONTRACTOR TO VERIFY THAT 1 US BA'I. • 2 ° I _ I • - I ��` I <br /> e • B1 0 �/ I c ( --- I I I I <br /> U5 .BAY VERIFY THAT LUMINAIRE POLE IS LUMINAIRE POLE IS CENTERED I • <br /> i • I / CENTERED ON THE EXPANSION JOINT. ON THE EXPANSION JOINT. I - I I I <br /> I --- I I I • • •r r • �� r• <br /> I • T —1— • • I • I <br /> a ,- 1 CB /24 I • I I I• { • I • �l \\ <br /> L • <br /> m I I I CB #4 .1: I I• L . -CB {5 <br /> I <br /> I I . I I <br /> \ I. I I. I • I / \ <br /> • I <br /> CONSTRUCTION NOTES <br /> GENERAL NOTES: O 2' WIDE DETECTABLE/TRUNCATED DOME WARNING LEGEND <br /> �+ STRIP-YELLOW. [ NEW HMA PAVEMENT <br /> 3 1. TRANSIT PLATFORM AND SIDEWALKS CONCRETE SHALL BE STANDARD GREY O CONTRACTION JOINT TO BE 3/16" WIDE BY 1/2" DEEP I _1 NEW CONCRETE PAVEMENT <br /> COLOR WITH MEDIUM BROOM FINISH. TROWELED JOINTS. <br /> S 2. TROWELED TOOL JOINT FINISH REQUIRED ALONG CURE UNES, DETECTABLE I <br /> TRUNCATED DOME WARNING STRIPS CONTRACTION JOINTS AND ALL O EXPANSION JOINT WITH PREMOLDED JOINT FILLER PER I ,6 NEW CONCRETE WALKWAY <br /> ?.5. EXPANSION JOINTS. WSDOT STD. PLAN F-30.10-03 WITH TOOL/TROWELED <br /> 3. SEE DETAIL DWG PV1 FOR TRANSIT CENTER PLATFORM CONCRETE FINISH. (DETAIL E) • LANDSCAPING <br /> m q THICKNESS. <br /> 4. SEE DWG PV1 FOR PAVEMENT AND SIDEWALK THICKNESS. O OPERATOR COMFORT STATION, SEE ARCHITECTURAL & Ll HAND HOLE <br /> of I 5. SLOPES GIVEN ARE APPROXIMATE. ACTUAL SLOPES VARY, SEE GRADING STRUCTURAL PLANS. <br /> Ta ► PLATFORM BUS AREA PLAN FOR SITE ELEVATION CONTROL. X CHAIN UNK FENCE <br /> g 6. SEE DWG'S. PVT-PV4 FOR CURB TYPE. O SEAT WALL, SEE DETAIL DWG PD4. <br /> a SEAT WALL SEE w 7. SEE DWG'S. CPI-CP4 FOR HORIZONTAL CONTROL AND SPOT ELEVATIONS. EXPANSION JOINTS <br /> z 8. SEE PAVING PLAN DWG. PV1 FOR PAVING SECTIONS AND LANDSCAPING 66 SEE VALLEY GUTTER DETAIL, DWG PD2. <br /> A DWG PD4 1 -' SECTION DETAIL. CONTRACTION JOINTS <br /> u, \\\\ 1 4% O p 9 PLANSRFOR 5 SHELTERS,STRUCTURAL NDSCREENS. BU DING. OOT NGS TAND I ONIC O BIKE RACK. .I,$'H'�� SPOT ELEVATIONS <br /> $ 0.5% 2.9% r - Fee 1 O CONSTRUCT 6"THICK CONCRETE PUD ACCESS DRIVE <br /> s�. . A 1O. •RIO- TO CO TR TIO CO TRA TOR SHALL V "IFY ALL AWCrT, (15' WIDE) GROUND SLOPE <br /> A - • LUMINAIRE AND AMENITY LOCATIONS TO HELP ENSURE APPROPRIATE <br /> o /- <br /> /-/%,/J j///l/j//// REPLACEMENT BETWEEN SHELTERS. O SEE INTEGRAL CURB DETAIL PER DETAIL DWG PV3. REMOVE AND REPLACE EXISTING <br /> 11.RESTORE ALL EXISTING IRRIGATION AND LANDSCAPING DISTURBED BY THIS V//7////I CEMENT CONC. WALKWAY. <br /> PROJECT TO PRE-PROJECT CONDITIONS. EXISTING IRRIGATION COMPONENT 10 SEE DWG PD1 FOR CONCRETE PAVEMENT TRANSIT LOOP <br /> G MAY BE REUSED IF FEASIBLE AND MUST BE REPLACED IF DAMAGED. DETAIL. SAWCUT <br /> RESTORE SOIL, LANDSCAPE PLANTINGS, ROCK, AND MULCH DISTURBED <br /> B SECTION C—C DURING CONSTRUCTION. EXISTING PLANTS MAY BE MOVED AND REPLANTED SEE DWG PV1 FOR HMA PAVEMENT DETAIL. 5 <br /> e 11 IF FEASIBLE, OR REPLACED IF DAMAGED. <br /> EAST TRANSIT AREA 12 CONSTRUCT TRANSIT PLATFORM PER C.O.E. SIDEWALK <br /> i N.T.S. FORD JO4"INT MEAT CONC. OVER 2" CSTC. SEE SHEET PD2 <br /> 7 13 CIP WALL. <br /> CONSTRUCTION SEQUENCING: <br /> i a1. SAWCUT AND REMOVE EXISTING CONCRETE WALKWAY AND 2' WIDE DETECTABLE/TRUNCATED DOME WARNING <br /> REMOVE SURFACE FEATURES CALLED OUT FOR RELOCATION. STRIP-BLACK. <br /> 11 5 2. INSTALL SHELTERS, BELOW GROUND UTILITIES, AND RELOCATED 15 1/4" SAWCUT EXPANSION JOINT FILLED WITH JOINT <br /> i SURFACE FEATURES. SEALER. <br /> 0 3. REPLACE CONCRETE WALKWAY AND MATCH EXISTING 2'x2' silo �NAVD88 <br /> y TOOLED JOINT PATTERN. MAX SLOPE 2.0%. aINSTALL BLACK/STENCIL PLATFORM GRAPHIC AT EACH I <br /> IllrSWIFT SHELTER. SEE SHEET BSP4 FOR DETAILS. <br /> 3 <br /> 4. RESTORE ALL DISTURBED LANDSCAPED AREA TO MATCH Know what's below. ' <br /> PREVIOUS CONDITIONS. <br /> 0_0 RT 4, Call before you dig. <br /> •B 3/16/17 CHANGE ORDER NO.1-RESPONSE TO CITY PERMIT COMMENTS MC DS 90 Drawing No. <br /> B 7/?1/19 RECORD DRAWING REVISIONS <br /> /� Dra.n By 1Oath <br /> 0/ SCALE COMMUNITY TRANSIT <br /> 5 9/2J/19 ADDITIONAL BUS SHELTERS MC p E RT E E T �-- • <br /> ��p O �4 f / '//m MMC 10/14/19 B S P 2 <br /> Designed By Horiz SEAWAY TRANSIT CENTER <br /> communitytransi� �" <br /> 2707 COLBY AVENUE,SUITE 900 � _ ecisTE"S� checked By 10/7 a/1$ Vert -70 sheet \o <br /> EVERETT.WA98201 /ONAL LNs' BC 10/14/19 — <br /> No. Date Revision By Appr. 425.252.7700 1800.615.9900 Approved By Project Number BUS SHELTER PLATFORM PLAN 45 <br /> of" <br /> 20160067.001 Too <br />