My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> Furnish references for information concerning all work listed above <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> IN <br /> Part 1.2, A,8, "Pipeline Contractor/Subcontractor Superintendent: Within the last <br /> ten (10) years the Pipeline Contractor/Subcontractor superintendent must have completed <br /> at least two (2) projects that include the construction of welded joint steel pipe with a <br /> diameter of 36-inches or greater. <br /> List the Pipeline Contractor/Subcontractor Superintendent name and projects that show that <br /> he or she has this experience. <br /> Name: <br /> PROJECT NAME YEAR OWNER LOCATION AND SIZE <br /> Furnish references for information concerning all work listed above <br /> NAME TITLE PHONE NUMBER EMAIL ADDRESS <br /> VOLUME 1, DIVISION 11 — EQUIPMENT <br /> SECTION 11 95 00, STORAGE TANK HYDRODYNAMIC MIXING SYSTEM <br /> 1. Part 2.1, C, 3, a <br /> Addendum 2 Page 3 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.