My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Part 1.2, A"Experience", delete the first sentence of 9. Documentation and replace with <br /> the following: "The Bidder shall submit the Bidder Qualification Statement as provided in <br /> the Section 00 45 13." <br /> SECTION 00 45 13, BIDDER QUALIFICATION STATEMENT <br /> 1. Part 1.2, A, 1 <br /> a. Delete"....at least five projects..."and replace with "....at least one project..." <br /> b. Delete "...at least 1.0 million gallons..." and replace with "...at least 750,000 <br /> gallons..." <br /> 2. Part 1.2, A, 2, delete paragraph in its entirety. Renumber succeeding paragraphs <br /> accordingly. <br /> 3. Part 1.2, A, 3 <br /> a. Delete "....at least three projects..." and replace with "....at least one <br /> project..." <br /> b. Delete"... at least 1.0 million gallons ..."and replace with "...at least 750,000 <br /> gallons..." <br /> c. Delete "Note: The Bidder's project superintendent and project <br /> superintendent cannot be the same individual." and replace with "Note: The <br /> Bidder's project manager and project superintendent cannot be the same <br /> individual." <br /> 4. Part 1.2,A,4, delete"...at least five projects..."and replace with"...at least two projects..." <br /> 5. Part 1.2,A, 5, delete"...at least two projects..."and replace with"...at least one project..." <br /> 6. Part 1.2, A,6, delete"...at least five projects..."and replace with"...at least two projects..." <br /> 7. Part 1.2, A,7, delete"...at least two projects..."and replace with "...at least one project..." <br /> Insert the following two paragraphs: <br /> Part 1.2, A,7, "Pipeline Contractor/Subcontractor: Within the last ten (10) years the <br /> Pipeline Contractor/Subcontractor must have completed at least three (3) projects that <br /> include the construction of welded joint steel pipe with a diameter of 36-inches or greater. <br /> List the Pipeline Contractor/Subcontractor's projects that show this experience. <br /> Name: <br /> Addendum 2 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.