My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> I EVERETT Public Works <br /> WASHINGTON <br /> ADDENDUM NO. 4 <br /> TO <br /> REPLACEMENT OF RESERVOIR 2 <br /> W.O. # UP-3658 <br /> ' MARCH 3, 2021 <br /> NOTICE TO PLANHOLDERS: <br /> ' Addendum No. 4 contains the following revisions, additions, deletions and clarifications and is <br /> hereby made a part of the contract documents for the above-named Project and shall be <br /> considered by all prospective bidders in submitting bids. <br /> ' Bidders must acknowledge receipt of Addendum No. 4 in the space provided in 00 41 13-1.5, <br /> Bid Form. Failure to comply with this requirement may render the Bid non-responsive and may <br /> cause its rejection. <br /> This Addendum consists of 9 pages, including all revisions, and attachments. <br /> The Bid date, time and location for receipt of Bids are unchanged by this Addendum. <br /> THE CONTRACT DOCUMENTS ARE MODIFIED AS FOLLOWS: <br /> ' VOLUME 1, DIVISION 00 — GENERAL REQUIREMENTS <br /> SEC I ION 00 60 13, CONTRACT <br /> ' Replace paragraph 1.2, C, 1 with the following: <br /> 9 <br /> "Substantial Completion of the Work shall be achieved within 425 working days after the <br /> effective date of the Notice to Proceed. <br /> ' VOLUME 1, DIVISION 01 — GENERAL REQUIREMENTS <br /> SEC 110N 01 22 00, MEASUREMENT AND PAYMENT <br /> Delete the second paragraph of Bid Item 17 and replace with the following: <br /> ' "Payment for Utilities Coordination shall constitute full compensation for all work required by <br /> Snohomish PUD to install primary conductors to Snohomish PUD standards. This shall include all <br /> re-routing of the existing primary power and communication circuits and new electrical service <br /> for the storage building and reservoir." <br /> VOLUME 1, DIVISION 07 —THERMAL AND MOISTURE PROTECTION <br /> ' SEC I ION 07 21 00, THERMAL INSULATION <br /> Replace paragraph 2.1, A with the following: <br /> Addendum 4 Page 1 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.