My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Walsh Construction Company II LLC 6/7/2021
>
Contracts
>
Capital Contract
>
Walsh Construction Company II LLC 6/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 3:53:32 PM
Creation date
6/10/2021 3:42:47 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Walsh Construction Company II LLC
Approval Date
6/7/2021
Council Approval Date
4/21/2021
Department
Public Works
Department Project Manager
Souheil Nasr
Subject / Project Title
Replacement of Reservoir 2
Public Works WO Number
UP3658
Tracking Number
0002940
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Walsh Construction II, LLC 8/24/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Walsh Construction II, LLC 8/7/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 <br /> A. Rigid insulation boards ' <br /> 1. Provide rigid Extruded Polystyrene (XPS) foam boards complying with ASTM C578 <br /> Type IV or V as indicated below, with a minimum compressive strength of 25 psi. <br /> 2. Minimum Long Term Thermal Resistance "R" Value at 75 °F mean temperature per <br /> inch of insulation thickness: R-5. <br /> 3. For insulation installed in roof rafter spaces, Owens Corning FOAMULAR° 250 XPS <br /> Rigid Foam Insulation, or approved equal. <br /> 4. For insulation installed under floor slab, Owens Corning FOAMULAR° NGX 1000, <br /> Type V, or approved equal. <br /> VOLUME 1, DIVISION 26 — ELECTRICAL I <br /> SEC I ION 26 05 00, GENERAL ELECTRICAL REQUIREMENTS <br /> Delete paragraph 1.8, B in its entirety. ' <br /> Replace paragraph 1.8, C with the following: <br /> "The Contractor shall include an additional, separate line item of $50,000 for power and <br /> communication utility fees within the electrical bid item. This amount shall be for all utility <br /> service and construction fees related to the re-routing of the existing primary power and <br /> communication circuits, currently in conflict with the locations for the new reservoir tanks. Also <br /> included are all utility service and construction fees related to the provisions of new electrical <br /> service for the storage building and reservoir. Actual cost shall be adjusted and billed to the 1 <br /> project during construction." <br /> VOLUME 3, DRAWINGS , <br /> On Drawing C420,the bottom line of callout E2 shall be changed from: "1-TB,X CY"to: "1-TB, 6 CY" <br /> On Drawing CD3, West Reservoir Roof Plan, replace "4'x12'ACCESS HATCH" with "4'x10'-2" <br /> INSPECTION ACCESS HATCH, SEE STRUC SHTS". <br /> On Drawing CD4, East Reservoir Roof Plan, replace "4'x12' INSPECTION ACCESS HATCH, SEE STRUC <br /> SHTS" with "4'x10'-2" INSPECTION ACCESS HATCH,SEE STRUC SHTS". <br /> On Drawing CD8, add the following notes to Detail 1.The reinforcement detail is included with this <br /> Addendum: <br /> "2. TRENCH DRAIN SHALL BE ZURN Z866-HDS OR APPROVED EQAUL. <br /> 3. REBAR REINFORCEMENT SHALL BE PER DETAIL BELOW." <br /> Addendum 4 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett, WA 98201 • (425) 257-8800 • Fax (425) 257-8882 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.